to concealed work that would be difficult to measure and record at a later date . <br /> Note related change order numbers where applicable . <br /> C . Organize record drawing sheets into manageable sets . Bind and add date and <br /> other identification on the cover of each set . Include the following minimum <br /> information , as applicable : <br /> 1 . Depths of various elements of foundation in relation to datum . <br /> 2 . Horizontal and vertical location of underground utilities and appurtenances <br /> referenced to permanent surface improvements or benchmarks and <br /> coordinates . <br /> 3 . Location of internal utilities and appurtenances concealed in construction <br /> referenced to visible and accessible features of structure . <br /> 4 . Field changes of dimensions and details . <br /> 5 . Changes made by Change Order or Field Order. <br /> 6 . Constructed elevations and inverts . <br /> 7 . Details not on the original Drawings . <br /> 8 . Information to be shown for the parking area shall be provided at a maximum <br /> of every 100 feet and at changes in surface slopes . <br /> 9 . Information to be shown for underground pipe shall include , but not be limited <br /> to the location of valves and fittings dimensioned to a baseline survey , <br /> benchmarks and coordinates , or permanent site structure . Elevations at top of <br /> pipe shall be provided every 100 feet and at locations where design elevations <br /> were shown on the plans . For situations where the pipeline is being adjusted <br /> to avoid conflicts with other utilities (less than 50' in total length ) , then <br /> elevations shall be provided at the beginning of the deflection ( i . e . the first <br /> bend ) , middle of the deflection ( i . el the point where the conflict would have <br /> occurred with the utility) , and the end of the deflection ( i . e . the last bend ) . <br /> 10 . Show elevation and location of all benchmarks used . <br /> 1 . 3 CERTIFICATION OF PROJECT RECORD DRAWINGS <br /> A . If requested OWNER will supply CONTRACTOR with Project Drawings in <br /> AutoCAD format on compact disc For the input Record Drawing information onto <br /> the AutoCAD files and return of the files to the OWNER in accordance with <br /> Section 01810 — Project Closeout , <br /> B . CONTRACTOR and CONTRACTOR' s surveyor will each certify as to the accuracy <br /> of the Record Drawings and submit to the OWNER in accordance with Section <br /> 01810 — Project Closeout . The following certifications shall appear on each sheet <br /> of the Record Drawings : <br /> Last Revised 12/2007 01720-2 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\H Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div <br /> 1 \01 720 - Record <br /> Documents.doc <br /> r <br />