Laserfiche WebLink
1 <br />to concealed work that would be difficult to measure and record at a later date. <br />Note related change order numbers where applicable. <br />C. Organize record drawing sheets into manageable sets. Bind and add date and <br />other identification on the cover of each set. Include the following minimum <br />information, as applicable: <br />1. Depths of various elements of foundation in relation to datum. <br />2. Horizontal and vertical location of underground utilities and appurtenances <br />referenced to permanent surface improvements or benchmarks and <br />coordinates. <br />3. Location of internal utilities and appurtenances concealed in construction <br />referenced to visible and accessible features of structure. <br />4. Field changes of dimensions and details. <br />5. Changes made by Change Order or Field Order, <br />6. Constructed elevations and inverts. <br />7. Details not on the original Drawings. <br />8. Information to be shown for the parking area shall be provided at a maximum <br />of every 100 feet and at changes in surface slopes. <br />9. Information to be shown for underground pipe shall include, but not be limited <br />to the location of valves and fittings dimensioned to a baseline survey, <br />benchmarks and coordinates, or permanent site structure. Elevations at top of <br />pipe shall be provided every 100 feet and at locations where design elevations <br />were shown on the plans. For situations where the pipeline is being adjusted <br />to avoid conflicts with other utilities (less than 50' in total length), then <br />elevations shall be provided at the beginning of the deflection (i.e. the first <br />bend), middle of the deflection (i.el the point where the conflict would have <br />occurred with the utility), and the end of the deflection (i.e, the last bend). <br />10. Show elevation and location of all benchmarks used. <br />1.3 CERTIFICATION OF PROJECT RECORD DRAWINGS <br />A. If requested OWNER will supply CONTRACTOR with Project Drawings in <br />AutoCAD format on compact disc For the input Record Drawing information onto <br />the AutoCAD files and return of the files to the OWNER in accordance with <br />Section 01810 — Project Closeout, <br />B. CONTRACTOR and CONTRACTOR's surveyor will each certify as to the accuracy <br />of the Record Drawings and submit to the OWNER in accordance with Section <br />01810 — Project Closeout. The following certifications shall appear on each sheet <br />of the Record Drawings: <br />Last Revised 12/2007 01720-2 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach Park\H Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div <br />1 \01 720 - Record <br />Documents.doc <br />