Laserfiche WebLink
5. Certification that each document as submitted is complete and accurate. <br />6. Signature of CONTRACTOR or his authorized representative. <br />1.5 RESPONSIBILITY FOR ACCURACY OF RECORD DOCUMENTS <br />A. The CONTRACTOR will be held responsible for the accuracy of Record Document <br />data and shall bear all costs incurred by the OWNER as a result of incorrect data <br />furnished by the CONTRACTOR that is contained in the Record Documents. <br />1.6 PAYMENT <br />A.Payment for Record Documents shall be made under the pay item for Record <br />Documents. <br />+ + END OF SECTION + + <br />Last Revised 12/2007 01720-4 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div <br />1\01720 - Record <br />Documents.doc <br />