Laserfiche WebLink
L <br /> SECTION 01810 <br /> PROJECT CLOSEOUT <br /> L <br /> DESCRIPTION OF REQUIREMENTS <br /> A . This Section of the Contract Documents is provided for the purpose of guiding <br /> the CONTRACTOR' s project closeout requirements and it is not intended to be <br /> all - inclusive . Closeout is defined to include the general requirements near the <br /> end of the Contract Time , in preparation for final acceptance , final payment , <br /> and normal termination of the Contract , occupancy by the OWNER or the <br /> OWNER' s operation and maintenance contractor, and similar actions <br /> evidencing completion of the Work . <br /> B . Closeout work will be required prior to the final 30 Calendar day completion <br /> period ready for final payment . <br /> 1 . 2 PREREQUISITES FOR FINAL ACCEPTANCE <br /> A . Related Requirements : <br /> 1 . General Conditions : Article 13 , Article 14 , and other Articles as applicable . <br /> 2 . Supplementary Conditions . <br /> 3 . Section 01720 , Record Drawings . <br /> 4 , Section 01830 , Bonds and Equipment Warranties , <br /> 5 . Sections 01710 , Site Cleanup and Restoration . <br /> 6 . All other Sections of these Specifications requiring specific closeout <br /> submittals or requirements of various trades . <br /> B . The following information shall accompany the final Application for Payment <br /> (except as previously delivered ) : <br /> 1 . All information required by General Conditions 14 . 07 and Supplementary <br /> Conditions to the General Conditions 14 . 07 . <br /> 2 . Final payment request . <br /> 3 . Final releases and supports from all subcontractors and suppliers not <br /> previously submitted and accepted . <br /> 4 . Certificates of insurance for products and completed operations . <br /> 5 . Updated final statement, accounting for additional changes to the Contract <br /> Sum , <br /> 6 . Certified copy of OWNER's final punch -list of itemized work to be <br /> completed or corrected , stating that each item has been completed or <br /> otherwise resolved for acceptance , endorsed and dated by the OWNER' s <br /> Project Representative . <br /> 7 , Section 00632 — Contractor' s Final Certification of the Work. <br /> Last Revised 12/2007 01800- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01810 - Project Closeout.doc <br />