My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> SECTION 01810 <br /> PROJECT CLOSEOUT <br /> L <br /> DESCRIPTION OF REQUIREMENTS <br /> A . This Section of the Contract Documents is provided for the purpose of guiding <br /> the CONTRACTOR' s project closeout requirements and it is not intended to be <br /> all - inclusive . Closeout is defined to include the general requirements near the <br /> end of the Contract Time , in preparation for final acceptance , final payment , <br /> and normal termination of the Contract , occupancy by the OWNER or the <br /> OWNER' s operation and maintenance contractor, and similar actions <br /> evidencing completion of the Work . <br /> B . Closeout work will be required prior to the final 30 Calendar day completion <br /> period ready for final payment . <br /> 1 . 2 PREREQUISITES FOR FINAL ACCEPTANCE <br /> A . Related Requirements : <br /> 1 . General Conditions : Article 13 , Article 14 , and other Articles as applicable . <br /> 2 . Supplementary Conditions . <br /> 3 . Section 01720 , Record Drawings . <br /> 4 , Section 01830 , Bonds and Equipment Warranties , <br /> 5 . Sections 01710 , Site Cleanup and Restoration . <br /> 6 . All other Sections of these Specifications requiring specific closeout <br /> submittals or requirements of various trades . <br /> B . The following information shall accompany the final Application for Payment <br /> (except as previously delivered ) : <br /> 1 . All information required by General Conditions 14 . 07 and Supplementary <br /> Conditions to the General Conditions 14 . 07 . <br /> 2 . Final payment request . <br /> 3 . Final releases and supports from all subcontractors and suppliers not <br /> previously submitted and accepted . <br /> 4 . Certificates of insurance for products and completed operations . <br /> 5 . Updated final statement, accounting for additional changes to the Contract <br /> Sum , <br /> 6 . Certified copy of OWNER's final punch -list of itemized work to be <br /> completed or corrected , stating that each item has been completed or <br /> otherwise resolved for acceptance , endorsed and dated by the OWNER' s <br /> Project Representative . <br /> 7 , Section 00632 — Contractor' s Final Certification of the Work. <br /> Last Revised 12/2007 01800- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01810 - Project Closeout.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.