Laserfiche WebLink
SECTION 01820 <br />WARRANTY INSPECTION <br />1.1 GENERAL <br />A. Approximately one year after Final Completion, the OWNER will make <br />arrangements with the ENGINEER and the CONTRACTOR for a post -final <br />inspection and will send a written notice to said parties to inform them of the date <br />and time of the warranty inspection. <br />B. Corrections of defective work noted by OWNER, ENGINEER's CONSULTANT, and <br />ENGINEER shall comply with the applicable sections of Article 13, General <br />Conditions. <br />C. After the inspection, the OWNER will inform the CONTRACTOR of any corrections <br />required to release the performance and payment bonds. <br />Last Revised 12/2007 <br />+ + END OF SECTION + + <br />01820-1 Wabasso Beach Pk Restoration <br />F:\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1\01820 - Warranty Inspection.doc <br />