Laserfiche WebLink
SECTION 01820 <br /> WARRANTY INSPECTION <br /> 1 . 1 GENERAL <br /> A . Approximately one year after Final Completion , the OWNER will make <br /> arrangements with the ENGINEER and the CONTRACTOR for a post-final <br /> inspection and will send a written notice to said parties to inform them of the date <br /> and time of the warranty inspection . <br /> B . Corrections of defective work noted by OWNER , ENGINEER' s CONSULTANT , and <br /> ENGINEER shall comply with the applicable sections of Article 13 , General <br /> Conditions . <br /> C . After the inspection , the OWNER will inform the CONTRACTOR of any corrections <br /> required to release the performance and payment bonds . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01820- 1 Wabasso Beach Pk Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01820 - Warranty Inspection .doc <br />