My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02000 <br /> MOBILIZATION & DEMOBILIZATION <br /> PART 1 - GENERAL <br /> 1 . 1 SCOPE <br /> A . The work specified in this Section consists of furnishing all material , transportation , <br /> tools , labor, and equipment with the one ( 1 ) time mobilization and demobilization of <br /> all the Contractor's men and equipment and all costs connected to obtainment of a <br /> performance bond for construction will be paid for at the lump sum price indicated <br /> on the Contractor' s proposal . All other costs associated with performance of the <br /> work and not addressed in other bid items - shall be included in the Contractor's <br /> proposal for under the bid item for mobilization and demobilization , such items may <br /> reasonably be assume to include but not limited to mobilize and demobilize <br /> equipment and personel , obtain required permits , attend preconstruction meetings , <br /> preparation and submittal of shop drawings , and alike preconstruction activities . <br /> 1 . 2 Preconstruction Meeting <br /> A . Prior to the start of construction , the Contractor shall meet on the site at the <br /> Wabbaso Beach Park with the Engineer and County to establish the construction <br /> access and pre-construction conditions of the site ( photographs will be taken by the <br /> Engineer. At this meeting the Engineer and Contractor shall review the limits of <br /> proposed fill , the areas of existing vegetation expected to be disturbed and <br /> transplanted , and the construction sequence and methods proposed by the <br /> CONTRACTOR . <br /> 1 . 3 Staking <br /> A. Staking of the proposed construction is to be performed by the Contractor prior to <br /> initiation of work by methods subject to the Engineer's approval . The Contractor <br /> shall provide to the Engineer a " Stake out Sheet" marked to illustrate the <br /> Contractor's staking for field control of the work. <br /> 1 . 4 Permit Compliance <br /> A . The Contractor shall abide by all notes and conditions indicated on the Construction <br /> Drawings and all permits associated with the work including the Florida Department <br /> of Environmental Protection ( FDEP ) , Indian River County and any other permits <br /> required . If the Contractor violates any condition of the permits and work is stopped <br /> by the State of Florida , Indian River County, or other public entity, then any <br /> additional costs incurred by the Contractor in association with stoppage of the work <br /> shall be paid by the Contractor and not charged to the County . The Contractor shall <br /> 02000- 1 02000 — Mob & Demob <br />
The URL can be used to link to this page
Your browser does not support the video tag.