Laserfiche WebLink
SECTION 02000 <br /> MOBILIZATION & DEMOBILIZATION <br /> PART 1 - GENERAL <br /> 1 . 1 SCOPE <br /> A . The work specified in this Section consists of furnishing all material , transportation , <br /> tools , labor, and equipment with the one ( 1 ) time mobilization and demobilization of <br /> all the Contractor's men and equipment and all costs connected to obtainment of a <br /> performance bond for construction will be paid for at the lump sum price indicated <br /> on the Contractor' s proposal . All other costs associated with performance of the <br /> work and not addressed in other bid items - shall be included in the Contractor's <br /> proposal for under the bid item for mobilization and demobilization , such items may <br /> reasonably be assume to include but not limited to mobilize and demobilize <br /> equipment and personel , obtain required permits , attend preconstruction meetings , <br /> preparation and submittal of shop drawings , and alike preconstruction activities . <br /> 1 . 2 Preconstruction Meeting <br /> A . Prior to the start of construction , the Contractor shall meet on the site at the <br /> Wabbaso Beach Park with the Engineer and County to establish the construction <br /> access and pre-construction conditions of the site ( photographs will be taken by the <br /> Engineer. At this meeting the Engineer and Contractor shall review the limits of <br /> proposed fill , the areas of existing vegetation expected to be disturbed and <br /> transplanted , and the construction sequence and methods proposed by the <br /> CONTRACTOR . <br /> 1 . 3 Staking <br /> A. Staking of the proposed construction is to be performed by the Contractor prior to <br /> initiation of work by methods subject to the Engineer's approval . The Contractor <br /> shall provide to the Engineer a " Stake out Sheet" marked to illustrate the <br /> Contractor's staking for field control of the work. <br /> 1 . 4 Permit Compliance <br /> A . The Contractor shall abide by all notes and conditions indicated on the Construction <br /> Drawings and all permits associated with the work including the Florida Department <br /> of Environmental Protection ( FDEP ) , Indian River County and any other permits <br /> required . If the Contractor violates any condition of the permits and work is stopped <br /> by the State of Florida , Indian River County, or other public entity, then any <br /> additional costs incurred by the Contractor in association with stoppage of the work <br /> shall be paid by the Contractor and not charged to the County . The Contractor shall <br /> 02000- 1 02000 — Mob & Demob <br />