Laserfiche WebLink
obtain a County building permit. <br />1.5 Construction Access <br />A. The Contractor may obtain access to the property via the construction access <br />shown on the Drawings. The Contractor may store materials and equipment on the <br />site as approved by the Engineer at the pre -construction meeting. The Contractor is <br />prohibited, by the expected FDEP permit, from activity on the beach after February <br />28v20081 <br />1.6 Payment <br />A. Payment for all materials and labor shall be made by the County to the Contractor <br />according to the unit prices and lump sum prices indicated on the Bid Schedule, <br />The Contractor shall submit copies of yard and weight tickets for all materials with <br />his Payment Request. The County shall make a final payment for each phase of <br />the work shall be made upon completion of the work by the Contractor and <br />acceptance of the work by the Engineer and the County. Any scrap material cut by <br />the Contractor will be made available to the County for recycling or otherwise <br />become the property of the Contractor if rejected by the County. <br />+ + END OF SECTION + + <br />02000=2 02000 — Mob & Demob <br />