My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> 1 . 2 PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are <br /> listed in paragraph SC-6 . 08 of the Supplementary Conditions . Per <br /> paragraph SC-6 . 08 . 0 of the Supplementary Conditions , the <br /> CONTRACTOR shall apply for, obtain , and pay for all other required <br /> permits and licenses <br /> Be Provide copies of all permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER . <br /> If there Is a conflict between any permit requirement and these <br /> Specifications , the more stringent specification or requirement shall <br /> govern . <br /> 1 . 3 GENERAL <br /> A. Do not begin any other construction work until the pollution control and <br /> treatment system has been constructed . <br /> Be From time to time , the OWNER or ENGINEER will inspect the pollution <br /> control and treatment system and may take effluent samples for analysis <br /> by a testing laboratory selected and paid for by the OWNER . If at any <br /> time , the OWNER or ENGINEER determines that the pollution control and <br /> treatment system is not functioning , the OWNER or ENGINEER will shut <br /> the portion of the project down that is not in compliance , and it shall <br /> remain shut-down until the pollution control and treatment system is <br /> properly constructed or repaired , and operating as intended . <br /> Co Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas <br /> as -soon as practicable in portions of the site where construction activities <br /> have temporarily or permanently ceased , but in no case more than 7 days <br /> after the construction activity has temporarily or permanently ceased . <br /> D . Inspect each pollution control system at least once per day . Clean and <br /> maintain each pollution control system as required by its manufacturer or <br /> the OWNER , until the system is no longer needed . If a water quality <br /> violation occurs , immediately cease all work contributing to the water <br /> quality violation and correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the <br /> receiving waters , nor cause injury to the public health or to public or <br /> private property, nor to the Work completed or in progress . The receiving <br /> point for water from construction operations shall be approved by the <br /> applicable regulatory agency and the ENGINEER . <br /> Last Revised 12/2007 02225-2 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9- <br /> 2008\Technical Specifications\Div 2\Coastal Tech Div 2\02225 - Erosion Control & Treatment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.