Laserfiche WebLink
L <br /> 1 . 2 PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are <br /> listed in paragraph SC-6 . 08 of the Supplementary Conditions . Per <br /> paragraph SC-6 . 08 . 0 of the Supplementary Conditions , the <br /> CONTRACTOR shall apply for, obtain , and pay for all other required <br /> permits and licenses <br /> Be Provide copies of all permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER . <br /> If there Is a conflict between any permit requirement and these <br /> Specifications , the more stringent specification or requirement shall <br /> govern . <br /> 1 . 3 GENERAL <br /> A. Do not begin any other construction work until the pollution control and <br /> treatment system has been constructed . <br /> Be From time to time , the OWNER or ENGINEER will inspect the pollution <br /> control and treatment system and may take effluent samples for analysis <br /> by a testing laboratory selected and paid for by the OWNER . If at any <br /> time , the OWNER or ENGINEER determines that the pollution control and <br /> treatment system is not functioning , the OWNER or ENGINEER will shut <br /> the portion of the project down that is not in compliance , and it shall <br /> remain shut-down until the pollution control and treatment system is <br /> properly constructed or repaired , and operating as intended . <br /> Co Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas <br /> as -soon as practicable in portions of the site where construction activities <br /> have temporarily or permanently ceased , but in no case more than 7 days <br /> after the construction activity has temporarily or permanently ceased . <br /> D . Inspect each pollution control system at least once per day . Clean and <br /> maintain each pollution control system as required by its manufacturer or <br /> the OWNER , until the system is no longer needed . If a water quality <br /> violation occurs , immediately cease all work contributing to the water <br /> quality violation and correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the <br /> receiving waters , nor cause injury to the public health or to public or <br /> private property, nor to the Work completed or in progress . The receiving <br /> point for water from construction operations shall be approved by the <br /> applicable regulatory agency and the ENGINEER . <br /> Last Revised 12/2007 02225-2 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9- <br /> 2008\Technical Specifications\Div 2\Coastal Tech Div 2\02225 - Erosion Control & Treatment.doc <br />