Laserfiche WebLink
SECTION 02225 <br /> EROSION CONTROL AND TREATMENT OF DEWATERING WATER AND <br /> STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water <br /> and stormwater runoff from the construction site and work area . The <br /> pollution control measures shall prevent turbid or otherwise polluted <br /> waters from being discharged from the construction site or work area , to <br /> undeveloped portions of the site or off-site , including downstream in the <br /> lateral " D , " lateral " C , " and lateral " 134 " canals . <br /> B . The OWNER considers pollution from dewatering water and stormwater <br /> runoff from a construction site or work area to be a very serious offense . <br /> The CONTRACTOR is solely responsible for preventing pollution caused <br /> by dewatering water and stormwater runoff from the construction site or <br /> work area . <br /> C. The pollution control measures specified herein represent minimum <br /> standards to be adhered to by the CONTRACTOR throughout the <br /> Project' s construction . The OWNER reserves the right to require the <br /> CONTRACTOR to employ additional pollution control measures , when in <br /> the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control <br /> measures during any phase of construction or operation to prevent <br /> erosion or to control sediment or other pollution , beyond those specified in <br /> the Drawings or herein , implement additional best management practices <br /> as necessary , in accordance with Chapter 4 , " Best Management Practices <br /> for Erosion and Sedimentation Control " of the Florida Erosion and <br /> Sediment Control Inspector' s Manual . An electronic copy may be <br /> obtained from the office of the Stormwater Division Manager, 4375 43rd <br /> Ave . Unit 102 , Vero Beach , FL 32967 . In the event of a conflict between <br /> the referenced Chapter 4 and these Specifications , the more stringent <br /> requirement shall apply . <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to <br /> comply with this Section . Alternatively , the OWNER may halt the <br /> CONTRACTOR' s operations until the CONTRACTOR is in full compliance <br /> with this Section . Time extensions for such down time will not be issued . <br /> Last Revised 12/2007 02225- 1 Wabasso Beach Pk Restoration <br /> F :\Public Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9- <br /> 2008\Technical Specifications\Div 2\Coastal Tech Div 2\02225 - Erosion Control & Treatment.doc <br />