My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02225 <br /> EROSION CONTROL AND TREATMENT OF DEWATERING WATER AND <br /> STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water <br /> and stormwater runoff from the construction site and work area . The <br /> pollution control measures shall prevent turbid or otherwise polluted <br /> waters from being discharged from the construction site or work area , to <br /> undeveloped portions of the site or off-site , including downstream in the <br /> lateral " D , " lateral " C , " and lateral " 134 " canals . <br /> B . The OWNER considers pollution from dewatering water and stormwater <br /> runoff from a construction site or work area to be a very serious offense . <br /> The CONTRACTOR is solely responsible for preventing pollution caused <br /> by dewatering water and stormwater runoff from the construction site or <br /> work area . <br /> C. The pollution control measures specified herein represent minimum <br /> standards to be adhered to by the CONTRACTOR throughout the <br /> Project' s construction . The OWNER reserves the right to require the <br /> CONTRACTOR to employ additional pollution control measures , when in <br /> the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control <br /> measures during any phase of construction or operation to prevent <br /> erosion or to control sediment or other pollution , beyond those specified in <br /> the Drawings or herein , implement additional best management practices <br /> as necessary , in accordance with Chapter 4 , " Best Management Practices <br /> for Erosion and Sedimentation Control " of the Florida Erosion and <br /> Sediment Control Inspector' s Manual . An electronic copy may be <br /> obtained from the office of the Stormwater Division Manager, 4375 43rd <br /> Ave . Unit 102 , Vero Beach , FL 32967 . In the event of a conflict between <br /> the referenced Chapter 4 and these Specifications , the more stringent <br /> requirement shall apply . <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to <br /> comply with this Section . Alternatively , the OWNER may halt the <br /> CONTRACTOR' s operations until the CONTRACTOR is in full compliance <br /> with this Section . Time extensions for such down time will not be issued . <br /> Last Revised 12/2007 02225- 1 Wabasso Beach Pk Restoration <br /> F :\Public Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9- <br /> 2008\Technical Specifications\Div 2\Coastal Tech Div 2\02225 - Erosion Control & Treatment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.