My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 9 PRESERVATION OF PUBLIC AND PRIVATE PROPERTY <br /> A . Exercise extreme care to avoid unnecessary disturbance of public and <br /> private property . Replace and replant trees , shrubbery , gardens , lawn , and <br /> other landscaping to restore the property to the condition existing prior to <br /> construction . <br /> B . All soil preparation procedures and replanting operations shall be under the <br /> supervision of a nurseryman experienced in such operations . <br /> C . Improvements to the land such as fences , walls , outbuildings , etc . , which of <br /> necessity must be removed to prepare the site as specified herein shall be <br /> replaced with equal quality materials and workmanship . <br /> D . Clean up the construction site immediately after construction is completed . <br /> Keep the site free of debris and dress up the construction site as the work <br /> progresses . <br /> + + END OF SECTION + + <br /> 02050-3 02050 — Site Preparation <br />
The URL can be used to link to this page
Your browser does not support the video tag.