My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
removed by the Contractor shall be removed from the site and disposed of at an <br /> approved upland disposal site . <br /> 1 . 5 GRUBBING <br /> A . Grubbing shall consist of the complete removal of all stumps , roots larger than 1 - 1 /2 <br /> inches in diameter , matted roots , brush , timber, logs and any other organic , metallic , <br /> or other debris not suitable for foundation purposes , resting on , under or protruding <br /> through the surface of the ground to a minimum depth of 18 inches below the <br /> subgrade . All depressions excavated below the original ground surface for or by the <br /> removal of such objects , shall be refilled with suitable materials and compacted to a <br /> density conforming to the surrounding ground surface . <br /> 1 . 6 STRIPPING <br /> A . The top six inches of the existing ground surface shall be considered topsoil . <br /> Stockpile topsoil at the excess material stockpile area as noted on the drawings . . <br /> Reuse topsoil on the project site to best extent practical and as approved by the <br /> ENGINEER . Dispose of any topsoil remaining after all work is in place as specified <br /> in the designated excess material stockpile area . <br /> 1 . 7 DISPOSAL OF MATERIAL <br /> A. No burning is permitted on -site . <br /> Be OFF-SITE DISPOSAL : Haul the material off-site and dispose of it in a legal <br /> manner. <br /> C . Obtain and comply with the provisions of all necessary permits and pay all <br /> required fees . <br /> D . Under no circumstances shall material be buried on -site . <br /> 1 . 8 LANDSCAPE PRESERVATION <br /> A . Take all steps necessary to preserve the natural landscape . Conduct <br /> construction operations to prevent any damage or destruction to the natural <br /> surroundings in the vicinity of the work . Except where clearing is necessary <br /> for permanent works , approved construction roads and for excavation <br /> operations , all native vegetation shall be preserved and protected from <br /> damage . All movements of crews and equipment shall be performed in a <br /> manner to prevent damage to any public or private property. Also see <br /> Section 01541 . <br /> 02050-2 02050 — Site Preparation <br />
The URL can be used to link to this page
Your browser does not support the video tag.