Laserfiche WebLink
drop inlet and it shall have the following features : two dump straps <br /> attached at the bottom to facilitate emptying ; lifting loops as an <br /> integral part of the system to be used to lift the sack from the basin ; <br /> and a yellow restraint chord approximately halfway up the sack to <br /> keep the sides away from the catch basin walls . The yellow <br /> restraint chord shall also serve as a visual means of indicating <br /> when the sack should be emptied . <br /> 2 . Installation : Install in each catch basin in accordance with the <br /> manufacturer' s specifications . Use as many of the specified <br /> filtration devices as required , at no additional cost to the OWNER . <br /> 3 . Product: All materials shall be new and unused . <br /> a . " SILTSACK" ( regular flow) , supplied by ACF Environmental , <br /> Inc . ( 1 -800=448-3636 ) <br /> http ://www , allbaba . com/member/geoman/product, htmll <br /> b . " FloGuard + PLUS , " supplied by Kristar Enterprises , Inc . ( 1 - <br /> 800-579008819 ) . <br /> F . Construction Site Egress Driveways : Minimize the transport of sediment <br /> and soil from the construction site or work area by vehicle wheels . <br /> Provide wash-down stations as required to wash vehicle tires and retain <br /> all washwater on-site . If a crushed rock driving surface is constructed at <br /> the vehicle exit point(s ) , do not use limerock aggregate . The system shall <br /> remove the sediment and soil from vehicle wheels before the vehicle <br /> leaves the construction site or work area . <br /> G . Rock and Stone for Erosion Control and Pollution Control and Treatment : <br /> 1 . Crushed Limerock : Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non -calcareous aggregate ( usually <br /> granite ) , washed and meeting the requirements of FDOT Standard <br /> Specifications for Road and Bridge Construction , Section 901 . <br /> H . Hay Bales : Hay bales shall not be used . <br /> I . Polyacrylamide ( PAM ) Application : <br /> 1 . Only use the cationic form of PAM . <br /> PART 3 EXECUTION <br /> A . Design , construct , and maintain the pollution control and treatment system <br /> to minimize erosion and capture and remove pollutants from the <br /> construction site and from all other areas disturbed by construction <br /> activities . <br /> * * END OF SECTION <br /> Last Revised 12/2007 02225-6 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9- <br /> 2008\Technical Specifications\Div 2\Coastal Tech Div 2\02225 - Erosion Control & Treatment. doc <br />