My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. General Site Backfill <br /> Compact underneath areas designated for vegetation and areas outside the 5 foot line from <br /> existing or proposed structures to a minimum 95 percent of maximum density per ASTM <br /> D 1557 , <br /> B . Backfill Under Pavements and Around Structures <br /> Compact underneath areas designated for surface pavements and around proposed <br /> structures to a minimum 98 percent of maximum density per ASTM D 1557 . <br /> 3 .06 FINISH OPERATIONS <br /> A. Grading <br /> Finish grades as indicated on the plans to within two inches . In areas where sodding is <br /> required, finished soil grade shall be set 3 -inches below the plan elevation to compensate <br /> for sod thickness. . For existing grades that will remain but which were disturbed by <br /> Contractor's operations, grade as directed. <br /> B . Protection of Surfaces <br /> Protect newly graded areas from traffic, erosion, and settlements that may occur. Repair or <br /> reestablish damaged grades, elevations, or slopes. <br /> 3 .07 DISPOSITION OF SURPLUS MATERIAL <br /> The Contractor may temporarily stockpile all unsuitable fill and backfill material for later disposal . <br /> The stockpiled material shall be piled in an orderly manner so as not to endanger the work or <br /> obstruct roadways or drainage within the designated job site location. All unsuitable material shall <br /> be disposed of by hauling off-site by the Contractor to a suitable disposal location . Waste, brush, <br /> refuse, stumps, roots, timber, etc. shall be removed from the site and disposed of in an approved <br /> manner. <br /> Excess suitable backfill material is the property of the Owner. The Owner shall determine the <br /> ultimate disposition of the material and may require the Contractor to relocate (haul) the material to a <br /> site within a 10 mile drive of the project site at no additional cost to the Owner. <br /> END OF SECTION <br /> 02302 — Excavation and Fill <br /> 02302 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.