Laserfiche WebLink
Where possible, the entire length of polyethylene pipe to be installed shall be joined and <br /> strung beyond the entrance of the bore path. In no case shall the ingress and/or egress, to <br /> public or private property be completely blocked . Should the stringing of an entire section <br /> of pipe block such ingress and/or egress, the section of pipe shall be segmented in maximum <br /> lengths beyond the entrance of the bore path. <br /> Once strung out for insertion into the bore hole, the trace wire specified for all piping shall <br /> be laid along the top of the pipe segment and taped to the pipe along its entire length. There <br /> shall be no discontinuity in the trace wire, and where a splice is needed, it shall be prepared <br /> prior to beginning the pipe back pull. <br /> D. Separation and Clearance <br /> 1 ) The bore depth shall equal or exceed 10 times the bore size under F.D . O .T. <br /> pavements. <br /> 2) When installed outside of pavement, the off set parallel to the pavement edge must <br /> be at least 3 '/2 times the bore size clearance from vitrified clay pipe sanitary sewer <br /> and any gas main. <br /> 3) Bore installations shall maintain at least 3 '/2 times the bore size clearance from <br /> vitrified clay pipe sanitary sewer and any gas main. <br /> 4) Bore installations shall maintain at least 18 -inches of separation between any sewer <br /> line crossings. <br /> E. Directional Boring <br /> Boring of the pipeline hole shall follow applicable sections of the recommended standards of <br /> ASTM F 1962 "Use of Maxi-Horizontal Directional Drilling for Placement of P.E. Pipe or <br /> Conduit Under Obstacles, Including River Crossings". The CONTRACTOR shall have <br /> adequately sized boring/pullback equipment, self-contained drilling fluid recycling system <br /> equipment and a properly trained crew with classroom and field experienced personnel <br /> manning the primary job positions. <br /> 1 ) Machine Size & Capability — The size and capacity of the drilling equipment must <br /> be compatible with the thrust and torque required to perform the drilling, reaming, <br /> and pipe pullback operations. The estimated forces applied to the pipe_ may be <br /> considered a minimum equipment requirement. <br /> The CONTRACTOR'S equipment shall be capable of drilling through consolidated <br /> or loose sands and clay as well as cemented layers of lime rock (commonly known <br /> as "cap rock") that may vary from loose fragments to 2 or 3 foot thick sections. <br /> The CONTRACTOR' S equipment must include a self-contained, mobile slurry <br /> system, capable of pumping and recycling the drilling fluid. Cuttings from the <br /> drilling process shall be hauled and disposed of by the CONTRACTOR. Should the <br /> County desire the cuttings for fill, the CONTRACTOR shall haul the material to the <br /> desired disposal site. The disposal site shall be within a 10 mile drive from the <br /> furthest bore location. All drilling fluid, mud, clay, etc . shall be hauled and disposed <br /> of by the CONTRACTOR at an acceptable disposal site . <br /> 02400 - Directional Bore Crossings <br /> 02400 = 7 <br />