My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Where possible, the entire length of polyethylene pipe to be installed shall be joined and <br /> strung beyond the entrance of the bore path. In no case shall the ingress and/or egress, to <br /> public or private property be completely blocked . Should the stringing of an entire section <br /> of pipe block such ingress and/or egress, the section of pipe shall be segmented in maximum <br /> lengths beyond the entrance of the bore path. <br /> Once strung out for insertion into the bore hole, the trace wire specified for all piping shall <br /> be laid along the top of the pipe segment and taped to the pipe along its entire length. There <br /> shall be no discontinuity in the trace wire, and where a splice is needed, it shall be prepared <br /> prior to beginning the pipe back pull. <br /> D. Separation and Clearance <br /> 1 ) The bore depth shall equal or exceed 10 times the bore size under F.D . O .T. <br /> pavements. <br /> 2) When installed outside of pavement, the off set parallel to the pavement edge must <br /> be at least 3 '/2 times the bore size clearance from vitrified clay pipe sanitary sewer <br /> and any gas main. <br /> 3) Bore installations shall maintain at least 3 '/2 times the bore size clearance from <br /> vitrified clay pipe sanitary sewer and any gas main. <br /> 4) Bore installations shall maintain at least 18 -inches of separation between any sewer <br /> line crossings. <br /> E. Directional Boring <br /> Boring of the pipeline hole shall follow applicable sections of the recommended standards of <br /> ASTM F 1962 "Use of Maxi-Horizontal Directional Drilling for Placement of P.E. Pipe or <br /> Conduit Under Obstacles, Including River Crossings". The CONTRACTOR shall have <br /> adequately sized boring/pullback equipment, self-contained drilling fluid recycling system <br /> equipment and a properly trained crew with classroom and field experienced personnel <br /> manning the primary job positions. <br /> 1 ) Machine Size & Capability — The size and capacity of the drilling equipment must <br /> be compatible with the thrust and torque required to perform the drilling, reaming, <br /> and pipe pullback operations. The estimated forces applied to the pipe_ may be <br /> considered a minimum equipment requirement. <br /> The CONTRACTOR'S equipment shall be capable of drilling through consolidated <br /> or loose sands and clay as well as cemented layers of lime rock (commonly known <br /> as "cap rock") that may vary from loose fragments to 2 or 3 foot thick sections. <br /> The CONTRACTOR' S equipment must include a self-contained, mobile slurry <br /> system, capable of pumping and recycling the drilling fluid. Cuttings from the <br /> drilling process shall be hauled and disposed of by the CONTRACTOR. Should the <br /> County desire the cuttings for fill, the CONTRACTOR shall haul the material to the <br /> desired disposal site. The disposal site shall be within a 10 mile drive from the <br /> furthest bore location. All drilling fluid, mud, clay, etc . shall be hauled and disposed <br /> of by the CONTRACTOR at an acceptable disposal site . <br /> 02400 - Directional Bore Crossings <br /> 02400 = 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.