Laserfiche WebLink
Where possible, the entire length of polyethylene pipe to be installed shall be joined and <br />strung beyond the entrance of the bore path. hi no case shall the ingress and/or egress, to <br />public or private property be completely blocked. Should the stringing of an entire section <br />of pipe block such ingress and/or egress, the section of pipe shall be segmented in maximum <br />lengths beyond the entrance of the bore path. <br />Once strung out for insertion into the bore hole, the trace wire specified for all piping shall <br />be laid along the top of the pipe segment and taped to the pipe along its entire length. There <br />shall be no discontinuity in the trace wire, and where a splice is needed, it shall be prepared <br />prior to beginning the pipe back pull. <br />D. Separation and Clearance <br />1) The bore depth shall equal or exceed 10 times the bore size under F.D.O.T. <br />pavements. <br />2) When installed outside of pavement, the off set parallel to the pavement edge must <br />be at least 3 'h times the bore size clearance from vitrified clay pipe sanitary sewer <br />and any gas main. <br />3) Bore installations shall maintain at least 3 '/2 times the bore size clearance from <br />vitrified clay pipe sanitary sewer and any gas main. <br />4) Bore installations shall maintain at least 18 -inches of separation between any sewer <br />line crossings. <br />E. Directional Boring <br />Boring of the pipeline hole shall follow applicable sections of the recommended standards of <br />ASTM F 1962 "Use of Maxi -Horizontal Directional Drilling for Placement of P.E. Pipe or <br />Conduit Under Obstacles, Including River Crossings". The CONTRACTOR shall have <br />adequately sized boring/pullback equipment, self-contained drilling fluid recycling system <br />equipment and a properly trained crew with classroom and field experienced personnel <br />manning the primary job positions. <br />1) Machine Size & Capability — The size and capacity of the drilling equipment must <br />be compatible with the thrust and torque required to perform the drilling, reaming, <br />and pipe pullback operations. The estimated forces applied to the pipe_ may be <br />considered a minimum equipment requirement. <br />The CONTRACTOR'S equipment shall be capable of drilling through consolidated <br />or loose sands and clay as well as cemented layers of lime rock (commonly known <br />as "cap rock") that may vary from loose fragments to 2 or 3 foot thick sections. <br />The CONTRACTOR'S equipment must include a self-contained, mobile slurry <br />system, capable of pumping and recycling the drilling fluid. Cuttings from the <br />drilling process shall be hauled and disposed of by the CONTRACTOR. Should the <br />County desire the cuttings for fill, the CONTRACTOR shall haul the material to the <br />desired disposal site. The disposal site shall be within a 10 mile drive from the <br />furthest bore location. All drilling fluid, mud, clay, etc. shall be hauled and disposed <br />of by the CONTRACTOR at an acceptable disposal site. <br />02400 = 7 <br />L <br />02400 - Directional Bore Crossings <br />