My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to remain in place for more than 48 hours prior to final connection and burial, the <br /> pipe ends shall be cut off above grade, and an appropriate plug shall be installed <br /> after thorough cleaning of the pipeline. <br /> 2) Pipe Cleaning — The CONTRACTOR shall utilize a hydraulic cleaning and vactor <br /> truck to remove all cuttings and drilling fluid from the pipe. <br /> 3) Site Cleanup — After inspection and approval by the Owner or his representative, the <br /> surface area disturbed by construction of this project must be restored to its original <br /> condition. The site must be cleaned of equipment, tools, and spoils. All drilling <br /> fluid must be cleaned from the site or its vicinity and properly disposed of. <br /> 4) Disposal — Pipe cuttings shall be disposed of by the CONTRACTOR at a solid waste <br /> disposal site or other disposal area, acceptable to the Owner. <br /> END OF SECTION <br /> e <br /> 02400 — Directional Bore Crossings <br /> 02400 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.