My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02511 <br /> BASE COURSE <br /> PART 1 - GENERAL <br /> 1 . 1 SCOPE <br /> A . The work specified in this Section consists of the construction of a base course <br /> composed of limerock constructed on prepared subgrade in accordance with these <br /> Specifications and in conformity with the lines , grades , notes , and typical cross <br /> sections shown on the Contract Drawings . <br /> PART 2 - MATERIALS <br /> 2 . 1 MATERIALS <br /> A. All limerock shall comply with Section 911 " Limerock Material for Base and <br /> Stabilized Base" or Section 915 " Cemented Coquina Shell Material of the DOT' s <br /> Standard Specifications for Road and Bridge Construction latest edition . All <br /> limerock used on the project shall be of the same grade and from the same source . <br /> Be The cemented coquina shell material shall have a minimum LBR of 100 . <br /> Co Before placement , 97 percent of the material shall ass a 3- 1 /2 inch sieve and it " <br /> p P p <br /> shall be graded uniformly down to dust . <br /> PART 3 - EXECUTION <br /> 3 . 1 DUMPING AND SPREADING <br /> A . Transport the limerock to the point where it is to be used over rock previously <br /> placed , and dump on the end of the last spread . In no case shall rock be dumped <br /> directly on the subgrade . <br /> Be Base material shall not be placed until the stabilized subgrade has passed all <br /> required compaction testing and been approved by the Engineer or his authorized <br /> representative . <br /> C . Spread the limerock uniformly . Remove and replace all segregated areas of fine or <br /> coarse rock with well -graded rock . <br /> D . When the specified compacted thickness of the base is greater than 6 inches , <br /> construct the base in two courses . The thickness of the first course shall be <br /> 02511 - 1 02511 — Base Course <br />
The URL can be used to link to this page
Your browser does not support the video tag.