My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately one- half of the total thickness of the finished base , or enough <br /> additional to bear the weight of the construction equipment without disturbing the <br /> subgrade . <br /> 3 . 2 FINISHING <br /> A . For double-coarse bases , blade the first course if necessary to secure a uniform <br /> surface and compact to the density specified herein immediately prior to spreading <br /> the second course . No other finishing of this course is required . <br /> Be After all spreading is completed , scarify the entire surface and shape it to produce <br /> the exact grade and cross section after compaction . For double-course bases , <br /> scarifying shall slightly penetrate the surface of the first course . <br /> C . If at anytime , the subgrade material becomes mixed with the base course material , <br /> .. excavate and remove the mixture , reshape and compact the subgrade , and replace <br /> the materials removed with clean base material , shaped and compacted as <br /> specified herein . <br /> 3 . 3 MOISTURE CONTENT <br /> A . If the base material does not have the proper moisture content to obtain the <br /> specified density, wet or dry it as required . When water is added , mix it uniformly <br /> with the limerock. If wetting or drying is required , these operations shall involve the <br /> manipulation of the entire width and depth of the base course before compaction . <br /> 3 . 4 COMPACTION <br /> �• A . All limerock base shall be compacted to a minimum of 98 percent of the maximum <br /> density as determined by AASHTO T- 180 . <br /> Be Compaction shall be accomplished with a self-propelled steel drum or pneumatic <br /> tired roller weighing at least 8 tons . All areas which are low and do not conform to <br /> the design template after rolling shall be scarified , filled with well -graded base <br /> material and the grading and rolling continued until the base conforms to the design <br /> grade and section . <br /> C . During final compaction operations , if blading of any area is necessary to obtain the <br /> true grade and cross section , complete the compacting operations for such area <br /> prior to making the density tests on the finished bases . <br /> D . If cracks or checks appear in the base , remove them by rescarifying , reshaping , <br /> refilling with limerock where needed , and recompacting , at no cost to the OWNER . <br /> 02511 -2 02511 — Base Course <br /> t <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.