My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valves shall be rated for a minimum 150 psi working pressure and a minimum body test pressure of <br /> 300 psi . When closed, the valve shall be drip-tight under rated pressure differential applied alternately <br /> to each side of the gate. <br /> The interior of the valve shall be epoxy lined in accordance with AWWA C550 . The exterior of the <br /> valve shall receive a minimum of two, 2 mill dry film thickness, asphaltic coating. All exterior exposed <br /> bolts, studs, and nuts shall be corrosion resistant, zinc-coated in conformance with ASTM A153 . <br /> 2 . 02 VALVE BOXES <br /> All buried valves shall have cast two or three piece valve boxes with cast iron covers. Valve boxes shall <br /> be provided with suitable heavy bonnets and extend to an elevation at or slightly above the valve <br /> bonnet. The barrel shall be one or two-piece, screw type, having 5 - 1 /4 inch shaft. Covers shall have <br /> "WATER" cast into the top for all water main. All valves shall have actuating nuts extended to within <br /> six inches of the top of valve box cover. All valve boxes shall be set in a square concrete valve box <br /> bonnet in accordance with the Drawings . <br /> PART 3 - EXECUTION OF WORK <br /> 3 .01 Gate valves shall be installed as typical sections of the pipeline. The requirements for pipeline <br /> foundation and backfill shall be followed in all regards when installing buried service gate valves. <br /> 3 .02 Care shall be taken so that the valve box does not transmit loads directly to the valve body. Valve boxes <br /> shall be installed perpendicular and flush with the ground surface as shown on the Plans. <br /> 3 . 03 All gate valves shall be mechanically restrained to the attached pipe sections. Pipe sections both <br /> upstream and downstream of each valve shall be restrained the minimum required length as that shown <br /> for a plug in the Restraint Length Detail on the Drawings . <br /> END OF SECTION <br /> e <br /> 02514 — Gate Valves <br /> 02514- 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.