My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Select Material <br /> Select Fill shall consist of uniform, clean, free draining sand or sand and shell containing <br /> less than 5% fines passing a No . 200 sieve . Laboratory test results of this fill shall be <br /> submitted to the Engineer for his approval. <br /> C . Topsoil <br /> Natural, friable soil representative of productive, well-drained soils in the area, free of. <br /> subsoil; stumps ; rocks larger than 1 inch diameter; brush; weeds ; toxic substances; and other <br /> material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5 . 5 to 7 . <br /> PART 3 - EXECUTION OF WORK <br /> 3 .01 SURFACE PREPARATION <br /> A. Clearing and Grubbing <br /> Unless indicated otherwise, remove trees, stumps, logs, shrubs, and brush within the clearing <br /> limits. Remove stumps entirely. Grub out matted roots and roots over 3 inches in diameter to at <br /> least 24 inches below existing surface. <br /> B. Stripping <br /> Strip existing topsoil to a minimum depth of 6 inches without contamination by subsoil material. <br /> Remove all existing topsoil with organic roots and materials. Stockpile topsoil separately from <br /> other excavated material and locate convenient to areas for soils exchange. <br /> C . Unsuitable Material <br /> All cleared, grubbed and demolished material deemed unsuitable shall be stockpiled on-site by <br /> the Contractor for disposal by soils exchange with material over excavated from the proposed <br /> stormwater management tract(s). <br /> D. Disposal <br /> In all areas where excavation is to be done, all earth, rock, muck and other materials shall <br /> be removed and separated as to suitable and unsuitable material for backfill as defined <br /> herein. <br /> The Contractor shall temporarily stockpile all unsuitable fill and backfill material for later <br /> disposal by soils exchange from suitable material to be over excavated from the on-site <br /> stormwater management lakes. The stockpiled material shall be piled in an orderly manner <br /> so as not to endanger the work or obstruct roadways or drainage within the designated job <br /> site location. All unsuitable material shall be disposed of by over excavating an equal <br /> volume of suitable material from the stormwater management lakes and subsequently <br /> filling the over excavated volume with the unsuitable material. All over excavated material <br /> shall be utilized and spread on the project site. Hazardous or waste materials shall not be <br /> used in the unsuitable material to be exchanged. Waste, brush, refuse, stumps, roots, <br /> timber, etc. shall be removed from the site and disposed of in an approved manner. <br /> 02302 - Excavation and Fill <br /> i 02302 = 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.