E. Removal of Muck, Rock and Other Unsuitable Material <br />All muck, rock , clay, marl, gravel, boulders, heterogeneous fill material and any other <br />organic or unsuitable "materials of excavation" encountered under pavement areas, <br />structures and utilities shall be excavated and removed. Also any "unforeseen obstacles" <br />such as buried trees or timbers, abandoned utilities, metal objects, concrete masses, or any <br />other type of debris encountered shall be removed. <br />All areas under proposed pavements or structures, which are indicated by testing to have <br />more than trace amounts of silt and/or clay within the top several feet of existing grade <br />shall be "proof rolled" using a vibratory compactor. Should the existing material <br />continuously yield or "pump" during the proof rolling, the Engineer shall be notified and a <br />determination made as to the amount of stripping needed to accomplish a stabilized <br />foundation. <br />Stripping shall be accomplished to clean in-place sand or other suitable material as <br />approved by the Engineer. Removal of unsuitable material within areas which are to <br />receive footings, slabs or other foundations shall be completed for the full area under such <br />structures and to ten feet minimum outside the maximum perimeter. Where pavement is to <br />be placed, said removal shall include all area under the surface and extend to the outside of <br />any shoulders, under any sidewalks and bike paths, or as directed by the Engineer. <br />All roots, stumps, logs, limbs, timbers, boulders, or any material which is not suitable for <br />backfill material shall be removed from the site promptly and excavated and disposed of by <br />the Contractor at his expense. <br />Removal of all "materials of excavation" and "unforeseen obstacles" will be paid for under <br />the heading of "Excavation and Hauling". <br />3.02 PROTECTION <br />A. <br />In <br />Sheeting and Bracing <br />Where excavations may endanger workmen, existing structures, utilities or other facilities, <br />it shall be the Contractor's responsibility to immediately install and maintain adequate <br />sheeting and bracing per OSHA specifications in order to protect said facility. No work <br />shall proceed in such excavations until the sheeting and bracing has been properly and <br />completely installed. The sheeting thus installed shall be removed as the work progresses <br />or, at the discretion of the Engineer, be cut off below finished grade and left in place. <br />Sheeting and bracing may be either steel or wood at the option of the Contractor. <br />Sheeting and bracing shall be installed in a manner that will allow for removal without <br />injuring or endangering workmen, the work, adjacent structures, and the like. Voids caused <br />by withdrawal of sheeting shall be promptly and completely filled with sand and <br />compacted to a degree equal to the surrounding soil. <br />Drainage and Dewatering <br />Provide for the collection and disposal of surface and subsurface water encountered during <br />construction. <br />02302 — Excavation and Fill <br />02302 - 4 <br />