My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02531 <br /> GRAVITY SEWER MANHOLES <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE <br /> The work to be performed under this item shall include the furnishing of all materials, equipment <br /> and labor required for the installation of pre-casts gravity sewer manholes as herein described and as <br /> shown on the Plans. The Contractor shall perform all excavation, backfilling, and related work <br /> required for the construction of the gravity sewer manholes in accordance with the provisions set <br /> forth under the applicable items of this Specification. <br /> 1 .02 REFERENCES <br /> Standard applicable in this Specification shall be : <br /> A. American Society for Testing and Materials (ASTM) <br /> 1 . ASTM A48-76 - Specifications for Gray Iron Castings. <br /> 2 . ASTM C478 -82a - Standard Specification for Pre-cast Reinforced Concrete <br /> Manhole Section <br /> 1 . 03 SUBMITTALS <br /> A. Shop Drawings - Prior to any fabrication or installation work, the Contractor shall <br /> furnish to the Engineer, for review and approval five (5) sets of shop drawings for the <br /> following items. All drawings shall be reviewed, approved and stamped by the <br /> Contractor prior to submittal to the Engineer. <br /> 1 . Pre-cast manholes <br /> B . Manufacturer's Data - Prior to any fabrication or installation work, the Contractor shall <br /> furnish to the Engineer, for review and approval, manufacturer's data for the following <br /> items : <br /> 1 . Manhole frames and covers <br /> 2 . Manhole rainguard boots <br /> 3 . Press seal pipe connectors <br /> 4. "Ram-Nek" mastic joint sealer <br /> PART 2 - MATERIALS <br /> w <br /> 2.01 MANHOLES <br /> A. Pre-cast Manholes - Pre-cast manholes shall conform with the typical manhole details as <br /> shown on the Plan and shall consist of a pre-casts reinforced base, cast monolithically <br /> with a minimum two foot length of barrel section, additional barrel sections and manhole <br /> cones. All concrete used in the construction of pre-cast manholes shall be Type H with a <br /> 28-day compressive strength of 4000 psi . <br /> 02531 — Gravity Sewer Manholes <br /> 02531 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.