Laserfiche WebLink
L <br /> L <br /> 9 . Empty installed pipe shall be secured against flotation due to potential trench <br /> flooding by timely placement of sufficient backfill or approved anchoring <br /> devices sufficient to resist pipe buoyancy. <br /> 3 . 09 INSTALLATION OF FITTINGS <br /> A. Fittings, plugs, and caps shall be set and jointed to pipe in the manner heretofore specified <br /> U for cleaning, laying and jointing pipe. <br /> B . Installation of manholes shall conform to the details as shown on the Drawings and, <br /> unless otherwise specified, shall conform with Section 425 of the 1986 Edition of the <br /> Florida D. O.T . Standard Specifications for Road and Bridge Construction. Backfill shall <br /> be placed in lifts not to exceed 12 inches loose depth and compacted to 95 percent of <br /> maximum density per AASHTO T- 180 in unpaved areas and to required subgrade <br /> density in areas of paving or curbing. <br /> 60 C . Density tests shall be taken on the compacted backfill at all manholes. There shall be a <br /> minimum of one test location for each manhole. The test location shall be taken at the <br /> location designated by the Engineer' s representative. The density tests shall be taken at <br /> each location at one foot intervals beginning at the bottom of the excavation and ending at <br /> the final grade. The costs of all testing shall be paid for by the Contractor. <br /> 3 . 10 INSTALLATION OF DETECTABLE BURIED WARNING TAPE <br /> Tape shall be attached to the pipe for its entire length. Tape shall also be placed at a maximum <br /> depth of 12 inches below finished grade directly above the pipe centerline . Following <br /> placement of tape, the trench shall be backfilled with due caution to prevent displacement or <br /> i• damage to the tape. <br /> 3 . 11 INSTALLATION OF DETECTABLE BURIED TRACE WIRE <br /> Trace wire shall be installed on all pipe and fittings, with splices, branches, connections and <br /> terminations as shown on the plans. <br /> 3 . 12 AS-BUILT DRAWINGS <br /> During the installation of gravity sewer lines, the Contractor ' s Registered Florida Surveyor <br /> and Mapper shall keep accurate records of the As-Built construction showing the <br /> location of all changes in elevation, alignment, services, utility crossings, structures <br /> and similar data. Items shall be located from permanent objects such as centerline of street, <br /> manholes, valves, etc. Immediately upon completion of the sanitary sewer inverts and prior to <br /> placement of roadway base, the Contractor shall deliver to the Engineer an As-Built Drawing, <br /> signed and sealed by a Florida registered surveyor, showing the manhole separations, inverts and <br /> rim elevations. <br /> END OF SECTION <br /> 1r <br /> 02530 — Gravity Sanitary Sewer Piping <br /> 02530- 9 <br />