My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mainline run between manholes shall be performed. If any test results are <br /> unsatisfactory, the Contractor shall re-excavate and recompact the backfill, at <br /> his expense, until the required compaction is obtained. <br /> 6. The costs of all sampling, proctor and density testing shall be paid for by the <br /> Contractor. <br /> 3 .08 PIPE SYSTEM LAYING AND JOINTING <br /> A. General <br /> 1 . Unless otherwise specified herein or directed by the Engineer, all pipe and <br /> fittings shall be laid and joined in accordance with the appropriate <br /> manufacturer's directions with regard to allowable barrel and joint deflection, <br /> spigot seating depth, gasket placement, lubrication, bolt torque, field <br /> cutting/trimming, and pushing/pulling methods for joint assembly. <br /> 2 . Prior to placing in the trench, each pipe section, joint, and fitting shall be <br /> checked for damage or defects such as cracks, blisters, coating/lining <br /> separation, gouges, and the like. Any damage or defective materials <br /> found shall not be installed unless approved by the Engineer, and shall be <br /> marked "REJECTED" and immediately removed from the work site. <br /> 3 . Prior to installation, the interior of all pipe and fittings shall be inspected for <br /> debris, sediment accumulation, sand, and the like, and shall be cleaned as <br /> required to remove such foreign matter. Joint surfaces such as gaskets, gasket <br /> grooves, spigots, and bells shall be cleaned of sand and grit prior to joining. <br /> 4. Gasket lubricants shall be stored and applied in a manner that will prevent <br /> significant contamination or pick-up of sand and grit. <br /> 5 . The pipe spigot shall be centered in and aligned with its mating bell prior to <br /> insertion and forced evenly in a straight line to seating depth, taking care <br /> not to over-bell the joint. Where required, deflections shall be made after <br /> the joint is seated. <br /> 6. Joining shall generally be done by hand or by push-bar with a cushion block <br /> whenever pipe size and weight permit. When a mechanical <br /> pushing/pulling device such as chain-puller, come-along, and the like is <br /> required, the device shall be used in a manner that will not deform gouge, <br /> chip, or otherwise damage the pipe or cause significant disturbance of the <br /> prepared bedding. In no case shall joints be made by "popping-on" or swinging <br /> the spigot into the bell to seat the joint. <br /> 7 . Fittings and appurtenances shall be fully, independently supported on the bedding <br /> or on a permanent foundation so as not to bear on the pipe upon completion of <br /> the installation. <br /> 8 . The installed piping system shall be kept free of dirt, trench water, and <br /> other foreign matter during the progress of the work, and all open ends of the <br /> line shall be sealed with watertight plugs whenever work is not in progress. <br /> 02530 — Gravity Sanitary Sewer Piping <br /> 02530- 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.