My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall the infiltration exceed 50 gal/day/inch of pipe diameter/mile of pipe (or 0.4 <br /> gal/hr/in/ 1000 ft) . <br /> B . Exfiltration Test: Exfiltration testing shall be conducted by filling the system with water <br /> and measuring the amount of exfiltration. Water shall be added to the system until the <br /> manhole with the lowest top elevation (test manhole) of that portion of the system being <br /> tested is filled to within 24 inches of its top. Testing of the system shall be segmented <br /> such that the difference between the top elevation of any two manholes being tested does <br /> not exceed 2 feet. Testing shall proceed for a continuous period of four hours with <br /> exfiltration amounts measured by adding known amounts of water to the beginning <br /> water level in the test manhole. In no case shall exfiltration exceed 100 gal/day/inch of <br /> pipe diameter/mile of pipe (or 0 . 8 gal/hr/in/ 1000 ft). Leakage from any manholes shall <br /> be included in the pipe exfiltration determination. <br /> C . Air Leakage Test: Air leakage tests may be required in lieu of infiltration/exfiltration at <br /> the option of the Owner. Air leakage tests on PVC gravity sewer pipe shall conform to <br /> ASTM F- 1417 . The testing shall be by compressed air from manhole to manhole. Plugs, <br /> caps and branch connections must be secured against blow-off during the test. The pipe <br /> and manholes shall be free of water during the test. The pipe shall be tested at 3 . 5 psi in <br /> excess of the groundwater pressure above the pipe. For each foot of water above the <br /> pipe at the deepest point, the air pressure shall be increased by 0.43 psi . The minimum <br /> time for the air pressure to drop by 0 . 5 psi shall be: <br /> Pipe Size Time in Minutes <br /> 6 inch 4.0 <br /> 8 inch 5 . 0 <br /> 10 inch 6. 5 <br /> 12 inch 7 . 5 <br /> 15 inch 9. 5 <br /> D. Test Failures: Should a test failure occur, necessary repairs shall be accomplished by the <br /> Contractor and the test repeated until within the established limits. The Contractor shall <br /> furnish the necessary labor, water, and all other items required to conduct the required <br /> testing and shall perform the necessary system repairs required to comply with the <br /> specified test. If the water supply is from the County's potable water system, a meter is <br /> required. Contractor is responsible for all costs associated with retesting . <br /> END OF SECTION <br /> 02533 - Testing Gravity Sewer System <br /> 02533= 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.