My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02535 <br /> TESTING FORCE MAINS <br /> 1 . SCOPE <br /> A. This Section describes the procedural , material, and acceptance requirements for <br /> cleaning and testing of the mainlines with regard to quality, alignment, tightness , and <br /> overall integrity of the installed system . <br /> 2. GENERAL <br /> A. The Contractor shall furnish all labor, materials , transportation, pumps , gauges, and <br /> equipment necessary to flush and test the installed pipe system as required by these <br /> Specifications . <br /> B. The Contractor shall provide and install all temporary connections , corporation stops , <br /> blowoffs , and the like required for flushing and testing, and upon completion of <br /> satisfactory tests, shall remove same and install appropriate plugging/capping devices <br /> or permanent connections as required. <br /> Co The Contractor shall notify the Owner and Engineer at least 48 hours in advance of <br /> all acceptance testing to be performed. No testing for acceptance of the work shall <br /> begin until the Owner and Engineer or his authorized representative are present. <br /> D . No interconnection shall be made between the new work and an existing active pipe <br /> system, except that necessary and approved by the Owner for testing, until the work <br /> is approved for use by the Engineer and until all approvals and clearances required by <br /> applicable construction permits for use of the work are issued by the permitting <br /> agency. <br /> E. At least 3 business days prior to conducting each item of work under this Section, the <br /> Contractor shall submit to the Engineer for approval a description of the specific <br /> equipment, materials , and procedures to be used, plus identification of proposed <br /> water source(s), to be used for this particular work item. <br /> 3 . FLUSHING <br /> A. Upon completion of each run of pipe between main valves or between a main valve <br /> and a terminal point, the pipe run shall be flushed with clean water at a minimum full <br /> diameter velocity of 2. 5 ft./sec . in order to remove sand, debris , and other foreign <br /> materials prior to pressure testing. <br /> B. The pipe run to be flushed shall be slowly filled with clean water with all valves open <br /> to allow escape of air pockets . High points in the pipe shall be vented with air release <br /> valves . When the system is full and prior to flushing, all valves shall be fully closed. <br /> 02535 - Testing Force Mains <br /> 02535 = 7 <br />