My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Trace wire shall run continuously along the pipeline from valve to valve or fitting. All <br /> splices shall be hot-soldered to provide continuity along the entire installation. <br /> Installation and splicing shall be in accordance with the details shown on the following <br /> insert. <br /> 4) Separation Requirements <br /> Force mains shall be laid at least ten ( 10) feet horizontally from any existing or <br /> proposed water main. Force mains crossing water mains shall be laid to provide a <br /> minimum vertical clearance of 18 inches between the outside of the water main and the <br /> outside of the force main. Where the force main passes over the water main, there shall <br /> be no joints within 10 feet of the water main. <br /> D . Field Quality Control <br /> 1 ) Hydrostatic Tests - The Contractor shall provide all necessary testing materials and <br /> shall perform all work required in connection with the test. All pipe shall be tested to a <br /> hydrostatic pressure of 100 p.s.i. for force mains and 150 p . s.i. for reuse mains . The <br /> required pressure as measured at the point of highest elevation shall be applied for not <br /> less than two hours, and all pipe, fittings, valves and joints shall be made water tight if <br /> leakage is evident. At a maximum, mains shall be tested from shut-off valve to shut-off <br /> valve. New mains shall be temporarily plugged or valved and pressure tested prior to <br /> tie-in or modification of existing pressure mains . <br /> No ductile iron pipe installations will be accepted unless and until the leakage is less <br /> than that as specified under Section 4.2 of the AWWA (ANSI) C600, P.V.C . pipe <br /> installations shall meet the leakage requirements of AWWA M23 as applicable. <br /> E. Adjusting and Cleaning <br /> 1 ) Restoring Surfaces - The top surfaces of the backfill shall be restored to the original <br /> or planned conditions . Trenches shall be carefully examined upon the completion of <br /> backfilling and surface irregularities that are dangerous or obstructive to traffic are to <br /> be removed. Paved sections shall conform in grade with adjacent areas and shall be <br /> of at least equal quality. Design mixes for flexible pavement shall be subject to <br /> approval by the Engineer. All damaged or undermined areas of existing pavement, not <br /> previously removed, shall be removed and restored to original conditions or in the <br /> specified manner. <br /> Equipment shall not travel over loose rock fragments, or other hard material, lying on <br /> sections or pavement which are not to be removed. Removal, replacement and <br /> restoration of areas of pavement shall be as indicated on drawings. <br /> F . Connection to Existing Mains <br /> The Contractor shall make no connection (open new valve) to another Contractor' s work or <br /> the Owner' s existing mains unless the work has been substantially completed, accepted, and <br /> paid for by the Owner, or expressed written permission to connect to the work has been given <br /> by the other Contractor and said written permission has been forwarded to the Engineer. <br /> END OF SECTION <br /> 02534- Sanitary Sewer Force Mains <br /> 02534 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.