Trace wire shall run continuously along the pipeline from valve to valve or fitting. All <br />splices shall be hot -soldered to provide continuity along the entire installation. <br />Installation and splicing shall be in accordance with the details shown on the following <br />insert. <br />4) Separation Requirements <br />Force mains shall be laid at least ten (10) feet horizontally from any existing or <br />proposed water main. Force mains crossing water mains shall be laid to provide a <br />minimum vertical clearance of 18 inches between the outside of the water main and the <br />outside of the force main. Where the force main passes over the water main, there shall <br />be no joints within 10 feet of the water main. <br />D. Field Quality Control <br />1) Hydrostatic Tests - The Contractor shall provide all necessary testing materials and <br />shall perform all work required in connection with the test. All pipe shall be tested to a <br />hydrostatic pressure of 100 p.s.i. for force mains and 150 p.s.i. for reuse mains. The <br />required pressure as measured at the point of highest elevation shall be applied for not <br />less than two hours, and all pipe, fittings, valves and joints shall be made water tight if <br />leakage is evident. At a maximum, mains shall be tested from shut-off valve to shut-off <br />valve. New mains shall be temporarily plugged or valved and pressure tested prior to <br />tie-in or modification of existing pressure mains. <br />No ductile iron pipe installations will be accepted unless and until the leakage is less <br />than that as specified under Section 4.2 of the AWWA (ANSI) C600, P.V.C. pipe <br />installations shall meet the leakage requirements of AWWA M23 as applicable. <br />E. Adjusting and Cleaning <br />1) Restoring Surfaces - The top surfaces of the backfill shall be restored to the original <br />or planned conditions. Trenches shall be carefully examined upon the completion of <br />backfilling and surface irregularities that are dangerous or obstructive to traffic are to <br />be removed. Paved sections shall conform in grade with adjacent areas and shall be <br />of at least equal quality. Design mixes for flexible pavement shall be subject to <br />approval by the Engineer. All damaged or undermined areas of existing pavement, not <br />previously removed, shall be removed and restored to original conditions or in the <br />specified manner. <br />Equipment shall not travel over loose rock fragments, or other hard material, lying on <br />sections or pavement which are not to be removed. Removal, replacement and <br />restoration of areas of pavement shall be as indicated on drawings. <br />F. Connection to Existing Mains <br />The Contractor shall make no connection (open new valve) to another Contractor's work or <br />the Owner's existing mains unless the work has been substantially completed, accepted, and <br />paid for by the Owner, or expressed written permission to connect to the work has been given <br />by the other Contractor and said written permission has been forwarded to the Engineer. <br />END OF SECTION <br />02534 - 9 <br />02534- Sanitary Sewer Force Mains <br />