My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specified herein shall be considered "minimum procedures" to prevent after-settlement <br /> and the Contractor shall reopen, refill and recompact any trenches indicating improper <br /> backfill procedures or after-settlement. <br /> All road crossings shall be backfilled immediately, made passable and maintained <br /> passable until the permanent repair is made . <br /> b . All Other Areas Under Pavements - The initial lift shall consist of clean, fine, <br /> select materials, not exceeding 3/4" in diameter under the haunches of the pipe. The <br /> material shall be placed in layers not to exceed 4". The initial lift shall be manually <br /> compacted to 95% of the maximum density as determined by AASHTO T- 180 . <br /> Subsequent lifts to 12" above the pipe shall be constructed as specified for the initial <br /> lift, except that had operated mechanical tampers may be used. Additional lifts from <br /> 12" above the pipe to the top of subgrade shall be carefully backfilled with material <br /> free from organic material and stones or clumps exceeding 3 -inches (2-inches in the <br /> final 6-final layer) in diameter, and compacted in 6-inch layers to an average maximum <br /> density of 95% as determined by AASHTO T- 180 . <br /> C, Areas Outside of Pavements - Backfill of all areas outside of pavements shall <br /> be constructed as specified above for "all other areas under pavements" except that the <br /> additional lifts shall be constructed as specified to the finished grade. <br /> d. Density Testing - The Contractor shall arrange to have sufficient soil tests <br /> made by an independent testing laboratory approved by the Engineer to demonstrate <br /> conformance of his work with the stability and compaction levels required by these <br /> specifications . Compaction tests shall be taken at intervals listed herein or as deemed <br /> necessary by the Engineer. <br /> In no case shall the Contractor proceed with construction over compacted material until <br /> the tests prove satisfactory and approval is given by the Engineer. <br /> hi general, at least one test for maximum dry density/optimum moisture content shall <br /> be performed on a representative sample of each inherently different material to be <br /> used for compacted backfill or embankment fill. <br /> As a minimum, in-place density tests shall be performed at the rate of one test location <br /> per 200 lineal feet (or fraction thereof) of trench on the compacted backfill and under <br /> each drive lane at all open cut, roadway crossings. Tests shall be taken in one foot lifts <br /> beginning at one foot above the pipe and ending at the final grade . Test locations shall <br /> be as directed by the Engineer or his authorized representative. If any test results are <br /> unsatisfactory, the Contractor shall re-excavate and recompact the backfill, at his <br /> expense, to the extent directed by the Engineer until the required compaction is <br /> obtained. The cost of all proctor and density tests shall be the responsibility of the <br /> Contractor and shall be included in the cost of installed and completed water main. <br /> 3) Installation of Trace Wire <br /> 02534- Sanitary Sewer Force Mains <br /> 02534 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.