My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> SECTION 02536 <br /> PAVEMENT MARKINGS <br /> PART 1 - GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section discusses painting thermoplastic traffic stripes and pavement <br /> markings . <br /> 1 . 2 TEMPORARY TRAFFIC STRIPING AND MARKING <br /> A . If required for traffic safety or if required by the ENGINEER or other agencies having <br /> jurisdiction , install temporary traffic striping and marking as soon as practical after <br /> the asphalt has been laid . If the temporary traffic stripes or marks become faded <br /> out before the permanent stripes and marks are applied , repaint them at no <br /> additional expense to the OWNER . <br /> B . Maintain safety along the road improvements using warning signs , traffic cones , <br /> emergency lights , and other necessary equipment until the temporary traffic striping <br /> and marking is applied . <br /> 1 . 3 TRAFFIC STRIPES AND MARKINGS WITHIN D . O . T . RIGHT-OF-WAY <br /> A . Use thermoplastic traffic stripes and markings for all work within FDOT right-of--ways <br /> and apply per Section 711 of the D . O . T . " Specifications for Road and Bridge <br /> Construction " and any other applicable D . O . T . specification or regulation articles <br /> 711 -9 and 711 - 10 do not apply <br /> B . At least 30 days must pass after the asphalt has been laid before any thermoplastic <br /> stripes or markings may be applied . <br /> 1 . 4 THERMOPLASTIC STRIPES AND MARKINGS WITHIN COUNTY <br /> RIGHT-OF-WAY AND ON SITE PAVING <br /> A . All thermoplastic stripes and markings to be applied within County right-of-ways or <br /> where shown on the DRAWINGS for the project site paving , shall be applied per <br /> paragraph 1 . 3 above and the Manual on Uniform Traffic control Devices . <br /> 1 . 5 INTERIOR ROADWAY AND PARKING LOT STRIPING <br /> A . The work under this heading consists of constructing centerline roadway stripes , <br /> stripes on the edge of the roadway, and parking spaces , stop bars , pavement <br /> y <br /> markings etc , where shown on the DRAWINGS as either paint or thermoplastic . <br /> 02536- 1 02536 — Pavement Markings <br />
The URL can be used to link to this page
Your browser does not support the video tag.