PART 3 - EXECUTION OF WORK <br /> 3 . 01 PLACEMENT OF MATERIAL <br /> The base course shall be constructed in accordance with the lines, grades, and typical section as <br /> shown on the Drawings . Unless otherwise noted construction shall conform to the provisions of <br /> Florida D. O.T. Standard Specifications for Road and Bridge Construction, Section 250, 2002 <br /> Edition. <br /> After the subgrade is completed and approved, the Contractor shall furnish and spread the coquina <br /> shell in a uniform distribution. Spread thickness shall be a minimum of 9 inches. Segregated areas of <br /> fine or course rock will not be permitted. Such areas shall be removed and replaced with properly <br /> graded rock. <br /> After the spreading is completed, the entire surface shall be compacted, scarified and shaped so as to <br /> produce the required grade and cross section after compaction. <br /> 3 . 02 COMPACTION <br /> The required compaction of the coquina shell base course shall be a minimum of 98 percent of the <br /> maximum dry density. <br /> No less than 8- 10 ton steel drum or pneumatic tired roller shall be used to compact the base course . <br /> All depressions shall be filled and the process of rolling and filling shall continue until a thoroughly <br /> compacted uniform surface is produced. During final compaction operations, if blading of any area <br /> is necessary to obtain the true grade and cross section, the compaction operations for such areas shall <br /> be completed prior to making the field density-compaction test on the finished base. <br /> Should the subgrade material become mixed with the base course material at any time, the <br /> Contractor shall remove the mixture, reshape and recompact the subgrade, replace the materials <br /> removed with additional coquina shell and reshape and recompact the coquina shell base at no cost <br /> to the Owner. <br /> If cracks or checks appear in the base which would impair the structural integrity of the base in the <br /> opinion of the Engineer, the Contractor shall remove the cracks or checks by rescarifying, reshaping, <br /> refilling with coquina shell where necessary, and recompacting at no cost to the Owner. <br /> The finished coquina shell base shall be checked for thickness at intervals of not more than 300 feet <br /> on center. Finished thickness shall be as shown on the Drawings . Any areas which are less than 1 /2 <br /> inch of the specified thickness shall be corrected by scarifying and adding rock. The scarifying shall <br /> extend for 50 feet either side of the deficient area. Areas which are less than 1 /2 inch deficient in <br /> thickness shall be corrected if the Engineer determines that the area is extensive or may adversely <br /> affect the quality of the finished work. <br /> 3 . 03 PRIME COAT <br /> The prime coat shall be a rapid curing liquid cut back asphalt equal or equivalent to RC-70 or RC- <br /> 250 at the Contractor's option, and conforming to Sections 300 and 916-2 of the 2002 Edition of the <br /> Florida D.O .T. Standard Specifications for Road and Bridge Construction. <br /> 02722 — Cemented Coquina Shell Base <br /> 02722 - 2 <br />