My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> The surface of the base material shall be cleaned after final compaction and the moisture content of <br /> the base shall not exceed 90 percent of the optimum moisture before the prime coat is applied. The <br /> prime coat shall be applied uniformly with a pressure distributor. The entire length of the spray bar <br /> shall be set at the height above the surface recommended by the Manufacturer for even distribution. <br /> The prime coat shall be applied to the finished base course at the rate of 0 . 15 gallons per square yard <br /> at a temperature between 100°F to 150°F. The prime coat shall be applied such that a period of no <br /> longer than two (2) hours lapse prior to application of the asphaltic concrete wearing course, unless <br /> the prime coat is covered with sand or screenings as outlined in Section 300-6 . 5 of the 2002 Edition <br /> of the Florida D .O .T. Specifications. <br /> 3 . 04 TESTING <br /> The maximum density and optimum moisture shall be determined in accordance with the Modified <br /> Proctor Test procedures of ASTM-D1557 or AASHTO-T180 (Method D). At a minimum, one ( 1 ) <br /> Modified Proctor Test shall be performed for each 10,000 square feet of base material on <br /> representative samples from location(s) designated by the Engineer. The percentage compaction and <br /> in-place density shall be determined according to procedures of ASTM-132167 "Test for Density of <br /> Soil In-Place by the Rubber Balloon Method" or the nuclear method ASTM- D2922. In-place <br /> density testing shall be performed at a minimum rate of four (4) Modified Proctor tests per 10,000 <br /> square feet of area to be paved unless quality control measures allow the Engineer to dictate fewer <br /> tests. Smaller projects shall require a minimum of two (2) test locations. <br /> I L END OF SECTION <br /> L <br /> L <br /> a <br /> L <br /> 02722 — Cemented Coquina Shell Base <br /> r 02722 - 3 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.