My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br /> 3 . 1 EXAMINATION <br /> A. Examine substrates and conditions, with Applicator present, for compliance with requirements for <br /> maximum moisture content and other conditions affecting performance of work. <br /> B . Maximum Moisture Content of Substrates : When measured with an electronic moisture meter as follows : <br /> 1 . Concrete: 12 percent. <br /> 2 . Cement Plaster: 12 percent. <br /> C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and <br /> primers . <br /> D . Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry. <br /> 1 . Beginning coating application constitutes Contractor's acceptance of substrates and conditions . <br /> 3 .2 PREPARATION <br /> A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting <br /> Specification Manual" applicable to substrates and paint systems indicated. <br /> B . Remove plates, machined surfaces, and similar items already in place that are not to be painted. If <br /> removal is impractical or impossible because of size or weight of item, provide surface-applied protection <br /> before surface preparation and painting. <br /> 1 . After completing painting operations, use workers skilled in the trades involved to reinstall items <br /> that were removed. Remove surface-applied protection if any. <br /> 2 . Do not paint over labels of independent testing agencies or equipment name, identification, <br /> performance rating, or nomenclature plates . <br /> C. Clean substrates of substances that could impair bond of paints, including dirt, oil, grease, <br /> and <br /> incompatible paints and encapsulants . <br /> 1 . Remove incompatible primers and reprime substrate with compatible primers as required to <br /> produce paint systems indicated. <br /> D . Concrete Substrates : Remove release agents, curing compounds, efflorescence, and chalk. Do not paint <br /> surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted <br /> in <br /> manufacturer's written instructions . <br /> E. Plaster Substrates : Do not begin paint application until plaster is fully cured and dry. <br /> 3 .3 APPLICATION <br /> A. Apply paints according to manufacturer' s written instructions . <br /> 1 . Use applicators and techniques suited for paint and substrate indicated. <br /> 2 . Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, <br /> paint surfaces behind permanently fixed items with prime coat only. <br /> Wabasso Beach Park Revised 01/08/08 <br /> Indian River County 09911 - 4 <br /> DAA Project No. 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.