My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br /> 3 . 1 EXAMINATION <br /> A. Examine substrates and conditions, with Applicator present, for compliance with requirements for <br /> maximum moisture content and other conditions affecting performance of work. <br /> 1 . Maximum Moisture Content of Substrates : When measured with an electronic moisture meter as <br /> follows : <br /> a. Masonry (Clay, Cement Plaster Substrate and CMU) : 12 percent. <br /> 2 . Verify compatibility with and suitability of substrates, including compatibility with existing <br /> finishes or primers. <br /> 3 . Begin coating application only after unsatisfactory conditions have been corrected and surfaces are <br /> dry. <br /> 4 . Coating application indicates acceptance of surfaces and conditions. <br /> 3 .2 PREPARATION <br /> A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting <br /> Specification Manual" applicable to substrates indicated. <br /> B . Remove plates, machined surfaces, and similar items already in place that are not to be coated. If <br /> removal is impractical or impossible because of size or weight of item, provide surface-applied protection <br /> before surface preparation and coating . <br /> 1 . After completing coating operations, reinstall items that were removed; use workers skilled in the <br /> trades involved. <br /> C . Clean substrates of substances that could impair bond of coatings, including dirt, oil, grease, and <br /> incompatible paints and encapsulants . <br /> 1 . Remove incompatible primers and reprime substrate with compatible primers as required to <br /> produce coating systems indicated. <br /> D . Cement Plaster Substrates: Remove efflorescence and chalk. Do not coat surfaces if moisture content <br /> or alkalinity of surfaces to be coated exceeds that permitted in manufacturer's written instructions . <br /> 3 .3 APPLICATION <br /> A. Apply high-performance coatings according to manufacturer's written instructions . <br /> 1 . Use applicators and techniques suited for coating and substrate indicated. <br /> 2 . Coat surfaces behind movable equipment and furniture same as similar exposed surfaces . Before <br /> final installation, coat surfaces behind permanently fixed equipment or furniture with prime coat <br /> only. <br /> 3 . Coat back sides of access panels, removable or hinged covers, and similar hinged items to match <br /> exposed surfaces . <br /> Wabasso Beach Park Revised 01/08/08 <br /> Indian River County 09960 - 4 <br /> DAA Project No. 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.