Laserfiche WebLink
H. Concrete <br />ASTM C 94, using 3/4 inch maximum -size aggregate, and having minimum compressive <br />strength of 2,500 psi at 28 days. <br />I. Grout <br />Provide grout of proportions one part Portland cement to three parts clean, well -graded sand <br />and a minimum amount of water to produce a workable mix. <br />J. Padlocks <br />CONTRACTOR shall provide temporary padlocks on all gates until the Owner occupies the <br />project. <br />PART 3 - EXECUTION <br />3.01 SITE PREPARATION <br />A. Clearing and Grading <br />Clear fence line of brush and other obstacles to install fencing. Establish a graded, <br />compacted fence line prior to fencing installation. Compact fill used to establish fence line. <br />B. Excavation <br />Excavate to dimensions indicated for concrete -embedded items, except in bedrock. If <br />bedrock is encountered, continue excavation to depth indicated or 18 inches into bedrock, <br />whichever is less, with a diameter in bedrock a minimum of 2 inches larger than outside <br />diameter of post. Clear post holes of loose material. Dispose of waste material. <br />3.02 FENCE INSTALLATION <br />Install fence on prepared surfaces to line and grade indicated. Secure fastening and hinge hardware in <br />place to fence framework by peening or welding. Allow for proper operation of components. Coat <br />peened or welded areas with a repair coating matching original coating. Install fence in accordance <br />with fence manufacturer's written installation instructions except as modified herein. <br />A. Post Spacing <br />Provide line posts spaced equidistantly apart, not exceeding 10 feet on center. Provide gate <br />posts spaced as necessary for size of gate openings. Provide corner or pull posts, with bracing <br />in both directions, for changes in direction of 15 degrees or more, or for abrupt changes in <br />grade. Provide drawings showing location of gate, corner, end, and pull posts. <br />B. Post Setting <br />Set posts plumb. Allow concrete and grout to cure a minimum of 7 days before performing <br />other work on posts. <br />C. Earth and Bedrock <br />02821 - 5 <br />02821 — Chain Link Fence and Gates <br />J <br />J <br />