Laserfiche WebLink
1 <br />2. <br />SECTION 02900 <br />OFF - SITE SURFACE RESTORATION <br />SCOPE <br />A. General <br />1) The work to be performed under this item shall include the selling and <br />delivering and the completing of "off-site" surface restoration as specified <br />herein. Final surface restoration shall follow completion of acceptable testing <br />results within 10 calendar days. However, in no case shall the area of <br />construction be allowed to remain unrestored more than 30 days after the <br />start of excavation. <br />B. References <br />1) Florida Department of Transportation Standard Specifications for Road and <br />Bridge Construction, 2000 Edition. <br />a. FDOT Section 320 - Hot Bituminous Mixtures - Plant, Methods and <br />Equipment. <br />b. FDOT Section 332 - Type II Asphaltic Concrete. <br />C, FDOT Section 912 - Sand -Clay Base Material <br />d. FDOT Section 913 - Shell Material <br />e. FDOT Section 915 - Cemented Coquina Shell Material <br />2) American Association of State Highway and Transportation Officials <br />(AASHTO) <br />a. AASHTO T-180 - Test for Moisture -Density Relations of Soils using <br />a 10 lb. Rammer and an 18 -inch Drop. <br />MATERIALS <br />A. Base Course for Paved Surfaces <br />1) The base course shall comply with Section 02722 of these Specifications <br />A. Final Asphaltic Surface Course <br />2) Asphalt surface course shall <br />Specifications. <br />02900 -1 <br />comply with Section 02741 of these <br />02900 — Off -Site Surface Restoration <br />