Laserfiche WebLink
C . Primer <br /> 1 ) Primer shall be hot bituminous RC -70 material . Alternate primers shall be <br /> acceptable only with prior approval of the Engineer. <br /> D . Temporary Surface Course <br /> 1 ) The temporary surface course shall be Type II asphaltic concrete in <br /> accordance with all applicable requirements of Section 332 of MOT <br /> " Standard Specifications for Road and Bridge Construction " , 2000 Edition, <br /> E . Base Course for Unpaved Roadways <br /> 1 ) Replacement base course for unpaved roadways/drives shall consist <br /> of a sand-clay- shell material meeting the approval of Indian River County <br /> Public Works Department. The material shall be a mixture of <br /> sand-clay material meeting the requirements of F .D . O . T . Section 912 and <br /> shell material meeting the requirements of F . D . O .T . Section 913 . The <br /> mixture shall be approximately 50 percent of each material . <br /> F . Grass Shrubbery, Trees Etc , <br /> 1 ) All planted vegetation which is removed, damaged or destroyed by <br /> project construction shall be replaced by like kind and in the same <br /> manner. Sodding shall be conducted in accordance with Section 02934, <br /> of these specifications . J a <br /> 3 . EXECUTION OF WORK <br /> A . Non State-Owned Public Pavement and Unpaved Base Courses <br /> 1 ) Base Course - The base course shall be constructed in accordance with <br /> these specifications to the details shown on the Plans . Any variance from the <br /> Plan details shall not be allowed without the prior written consent of the <br /> Engineer. Base Course shall be constructed in accordance with Section <br /> 02722 . <br /> 2) Priming - Before any bituminous material is applied, all loose material, dust, <br /> dirt and other foreign material which might prevent proper bond shall be <br /> removed from the base for the full width of application. The surface to be <br /> primed shall have any glazed finish removed by "hard-planing" prior <br /> to the application. The bituminous material to be used shall be RC-70 or <br /> RC-250 . Priming shall be conducted in accordance with Section 02722 , <br /> 3 ) Temporary Asphaltic Surface Course - If Contractor is not prepared to <br /> place a final asphaltic surface restoration course within 24 hours after <br /> backfilling, a temporary asphaltic surface course shall be applied. <br /> 02900 — Off-Site Surface Restoration <br /> 02900 - 2 <br />