Laserfiche WebLink
After the prime coat has had adequate time to cure, and prior to the <br />installation of a temporary surface course, the Contractor shall clean the <br />prepared base of all loose sand and other deleterious materials. If, in <br />the opinion of the Engineer, the prepared surface is unsuitable to receive <br />the temporary surface course without tacking, a tack coat. Once the <br />surface has been properly prepared, the Contractor shall install a 2 -inch <br />layer of Type II Asphaltic Concrete in accordance with the details shown <br />on the Plans as a temporary surface course. Said Type II Asphaltic <br />Concrete shall conform to all of the applicable requirements of Section 332 <br />of the Florida Department of Transportation "Standard Specifications for <br />Road and Bridge Construction," 2000 except that "Job Mix Formula" will <br />not be required. <br />The temporary surface course may be spread with a spreader box in lieu of <br />a self-propelled mechanical spreader. <br />B. State -Owned Public Pavement <br />1) Restoration within all State-owned and maintained paved rights-of-way shall <br />be made in strict compliance with these specifications and the details shown <br />on the Plans. All construction materials and procedures shall conform to <br />the Florida Department of Transportation "Standard Specifications for Road <br />and Bridge Construction," 2006 Edition. <br />2) All work shall be subject to final inspection and approval of the Florida <br />Department of Transportation and shall be completed as expeditiously as <br />possible. <br />C. Driveways, Parking Lots and Miscellaneous Thorou hg fares <br />1) All driveways, parking lots, unpaved streets, and other miscellaneous <br />thoroughfares disturbed by trenching operations shall receive a <br />minimum 6 -inch thickness of base course as previously specified in <br />paragraph 3.A.1) above. Those areas with surface finishes (asphalt, rock, <br />concrete, etc.) disturbed by trenching operations shall have the final surface <br />courses replaced in kind with a minimum 14nch thickness surface course, <br />except for concrete which shall be a minimum thickness of 4 -inches. <br />The Contractor's attention is called to the fact that all surface <br />improvements constructed since the date of base mapping may not be <br />shown and that the Contractor is required to repair all surfaces <br />disturbed by construction, whether shown on the plans or not. <br />D. Rights -of -Way and/or Easements in Grass and Shrubbery Plots <br />1) Rights -of --way and/or easements in grass and shrubbery plots shall be <br />restored to the condition existing prior to making the excavation. All <br />shrubbery, ornamental trees and other plantings shall be fully <br />protected. If it is found necessary to remove any grass, shrubbery or <br />02900 — Off -Site Surface Restoration <br />02900 - 3 <br />