My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Be Stringers shall be fastened to each pile cap with LTS 12SS Simpson Strong Tie <br /> Stainless Steel Twist Straps . Straps shall be connected using 1 - 1 /2 " 10d nails . All <br /> Twist Strap holes shall be utilized . <br /> C . Stringer butt-joints must occur over the pile cap and must use a scab to splice the <br /> union where a stringer is not fully supported by a pile cap beneath the joint . Spliced <br /> stringers shall be joined using 3/8 " bolts with washers on both sides . Stringers <br /> adjacent to piles shall be fastened to piles ; said stringers shall be connected to piles <br /> using 3/8 " bolts with washers on both sides ; Bolt heads shall be positioned on the <br /> outside of the piles . Nuts shall be torqued to a minimum of 30 Ib . -ft , <br /> D . All decking planks shall be screwed down to stringers with two (2 ) equally spaced <br /> # 10 2 '/2 inch Stainless Steel screws per plank at each stringer. Screw shall be <br /> counter driven and flush with wood . Finish by sealing all decking with a topical water <br /> repellent after installation . <br /> E . Railings shall be fastened to each 6x6 pile with 3/8" bolts with washers on both <br /> sides . Bolt head and washer shall be counter sunk on rail side , and flush with wood . <br /> F Rail cap shall be fastened to top of each 6x6 pile with three (3 ) # 10 2 '/2 inch <br /> Stainless Steel screws . Additionally , rail cap shall be fastened to side railing with <br /> # 10 2 '/2 inch Stainless Steel screws equally spaced at 1 foot . All screws shall be , <br /> counter driven , and flush with wood . <br /> G Pickets shall be fastened to rails with two (2 ) equally spaced # 10 2 '/2 inch Stainless <br /> Steel screws per picket at each rail . Pre-drill to prevent splitting . <br /> H . Construction adhesive shall be used during assembly, at all lumber contact points in <br /> instances where nails are to be the only fastener. <br /> I . All exposed edges of the railings and deck planks shall be beveled and sanded <br /> P 9 9 <br /> smooth to remove splinters and sharp edges . <br /> + + END OF SECTION + + <br /> i? <br /> 03000-2 03000 — Boardwalk <br />
The URL can be used to link to this page
Your browser does not support the video tag.