My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L5 QUALITY ASSURANCE <br /> A. Installer Qualifications : A specialist who is licensed according to regulations of authorities having <br /> jurisdiction to apply termite control treatment and products in jurisdiction where Project is located. <br /> B . Regulatory Requirements : Formulate and apply termiticides according to the EPA-Registered Label. <br /> C . Source Limitations : Obtain termite control products from a single manufacturer for each product. <br /> 1 . 6 PROJECT CONDITIONS <br /> A. Environmental Limitations : To ensure penetration, do not treat soil that is water saturated or frozen. Do <br /> not treat soil while precipitation is occurring. Comply with requirements of the EPA-Registered Label E ' <br /> and requirements of authorities having jurisdiction. <br /> 1 . 7 COORDINATION <br /> A. Coordinate soil treatment application with excavating, filling, grading, and concreting operations. Treat <br /> soil under footings, grade beams, and ground-supported slabs before construction. <br /> 1 . 8 WARRANTY <br /> A. Special Warranty: Manufacturer' s standard form, signed by Applicator and Contractor certifying that <br /> termite control work, consisting of applied soil termiticide treatment, will prevent infestation of <br /> subterranean termites . If subterranean termite activity or damage is discovered during warranty period, <br /> re-treat soil and repair or replace damage caused by termite infestation. <br /> 1 . Warranty Period: Five years from date of Substantial Completion, <br /> PART2 - PRODUCTS <br /> 2 . 1 MANUFACTURERS <br /> A. Available Manufacturers : Subject to compliance with requirements, manufacturers offering products that <br /> may be incorporated into the Work include, but are not limited to, the following : <br /> 1 . Termiticides : <br /> a. Bayer Corporation; Premise 75 . <br /> b . Dow AgroSciences LLC ; Dursban TC. <br /> C. FMC Corporation, Agricultural Products Group; Torpedo . <br /> d. Syngenta; Demon TC, <br /> Wabasso Beach Park <br /> Indian River County <br /> DAA Project No . 6008 <br /> 02361 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.