My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 04815 - GLASS UNIT MASONRY ASSEMBLIES <br /> L <br /> PART 1 - GENERAL <br /> LI RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br /> Division 1 Specification Sections, apply to this Section. <br /> 1 .2 SUMMARY <br /> A. This Section includes glass block set in mortar. <br /> B . Related Sections include the following: <br /> 1 . Division 5 Section "Metal Fabrications" for steel channel frames and loose steel lintels at glass <br /> unit masonry assemblies. <br /> 1 .3 SUBMITTALS <br /> A. Product Data: For each type of product indicated. Include glass block, cementitious materials, and <br /> accessories . <br /> B . Product Approval: Provide Miami-Dade product approval for exterior application of glass block <br /> assembly, complying with wind pressures shown on the structural drawings . <br /> C . Shop Drawings : Show fabrication and installation details for glass unit masonry, including vertical and <br /> horizontal coursing, anchors, reinforcement, and expansion strips. <br /> D . Samples for Initial Selection: Manufacturer's actual glass-block units. <br /> E. Samples for Verification: Panels consisting of four full-size glass-block units with mortar joints. <br /> 1 . Provide Samples for each form, pattern, and color of glass block and color of joint material <br /> indicated or selected by Architect. <br /> 1 .4 QUALITY ASSURANCE <br /> A. Source Limitations for Glass Block: Obtain each type and pattern of glass block through one source from <br /> a single manufacturer. <br /> B . Source Limitations for Accessory Materials : Obtain each cementitious material and accessory <br /> component through one source from a single manufacturer and each aggregate from one source or <br /> producer. <br /> Wabasso Beach Park <br /> Indian River County <br /> DAA Project No . 6008 <br /> 04815 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.