Laserfiche WebLink
1. Slabs -on -Grade: Under ground -supported slab construction, including footings, building slabs, <br />and attached slabs as an overall treatment. Treat soil materials before concrete footings and slabs <br />are placed. <br />2. Foundations: Adjacent soil including soil along the entire inside perimeter of foundation walls, <br />along both sides of interior partition walls, around plumbing pipes and electric conduit penetrating <br />the slab, and around interior column footers, piers; also along the entire outside perimeter, from <br />grade to bottom of footing. Avoid soil washout around footings. <br />3. Masonry: Treat voids. <br />4. Penetrations: At expansion joints, control joints, and areas where slabs will be penetrated. <br />B. Avoid disturbance of treated soil after application. Keep off treated areas until completely dry. <br />C. Protect termiticide solution, dispersed in treated soils and fills, from being diluted until ground -supported <br />slabs are installed. Use waterproof barrier according to EPA -Registered Label instructions. <br />D. Post warning signs in areas of application. <br />E. Reapply soil treatment solution to areas disturbed by subsequent excavation, grading, landscaping, or <br />other construction activities following application. <br />END OF SECTION 02361 <br />Wabasso Beach Park <br />Indian River County <br />DAA Project No. 6008 <br />02361 - 4 <br />