Laserfiche WebLink
B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Clean substrates of projections and substances detrimental to application. <br />3.3 INSTALLATION <br />A. General: Comply with siding and soffit manufacturer's written installation instructions applicable to <br />products and applications indicated unless more stringent requirements apply. <br />1. Do not install damaged components. <br />B. Install fiber -cement siding and soffit and related accessories. <br />1. Install fasteners no more than 24 inches (600 mm) o.c. <br />C. Install joint sealants as specified in Division 7 Section "Joint Sealants" and to produce a weathertight <br />installation. <br />3.4 ADJUSTING AND CLEANING <br />A. Remove damaged, improperly installed, or otherwise defective materials and replace with new materials <br />complying with specified requirements. <br />B. Clean finished surfaces according to manufacturer's written instructions and maintain in a clean condition <br />during construction. <br />END OF SECTION 07460 <br />Wabasso Beach Park Revised 01/08/09 <br />Indian River County 07460-4 <br />DAA Project No. 6008 <br />