My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 .6 ERECTION TOLERANCES <br /> A. Installation Tolerances : Shim and align sheet metal roofing within installed tolerance of 1 /4 inch in 20 <br /> feet (6 mm in 6 m) on slope and location lines as indicated and within 1 /8-inch (3 -mm) offset of adjoining <br /> faces and of alignment of matching profiles . <br /> B . Installation Tolerances : Shim and align sheet metal roofing within installed tolerances specified in <br /> MCA's " Guide Specification for Residential Metal Roofing . " <br /> 3 . 7 CLEANING AND PROTECTION <br /> A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering. <br /> B . Clean off excess sealants. <br /> C. Remove temporary protective coverings , and strippable films as sheet metal roofing is installed unless <br /> otherwise indicated in manufacturer's written installation instructions . On completion of sheet metal <br /> roofing installation, clean finished surfaces as recommended by sheet metal roofing manufacturer. <br /> Maintain sheet metal roofing in a clean condition during construction. <br /> D . Replace sheet metal roofing components that have been damaged or have deteriorated beyond successful <br /> repair by finish touchup or similar minor repair procedures . <br /> Wabasso Beach Park 07610 - 10 <br /> Indian River County <br /> DAA Project No. 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.