be repaired by setting side forms and replacing eroded concrete. After the side forms are <br />set, fresh concrete shall be placed and finished prior to texturing and curing. After the <br />pavement has hardened, remedial work shall not be permitted. Areas that do not comply <br />with these Specifications shall be corrected after the curing period has terminated. <br />3.05 CURING <br />A. After finishing operations have been completed and immediately after the free water has <br />left the surface, the surface of the slab and, for slip formed pavements, the sides of the slab <br />shall be coated and sealed with a uniform layer of membrane curing compound applied at the <br />rate of not less than one gallon per 200 square feet of surface. When the forms are removed, <br />curing compound shall be applied to the sides of the slab. <br />B. Areas in which the curing membrane is damaged within a period of three (3) days shall be <br />resprayed with curing compound. <br />3.06 EXPANSION AND CONTRACTION JOINTS <br />A. Traverse and longitudinal joints shall be constructed to the dimensions and at the spacing shown. <br />on the Drawings or at maximum 10 foot intervals. Transverse joints shall extend the entire width <br />of the pavement and through the curbs. Joints may be formed in the plastic concrete or sawed after <br />the concrete has hardened. <br />B. Formed joints may be constructed by installing a parting strip to be left in place or by depressing <br />an approved tool into the plastic concrete. <br />C. Sawing of <br />joints shall begin as soon as the concrete has hardened sufficiently to permit <br />sawing <br />without excessive raveling and before <br />uncontrolled cracking occurs. If necessary, the <br />sawing <br />operations <br />shall be carred on both day <br />and night, regardless of weather conditions. <br />D. Where construction methods require joint seaing, all joints shall be sealed before the pavement <br />is exposed to traffic, including construction traffic. Prior to sealing, all foreign material <br />shall be removed from the joints and the joints shall be thoroughly dry. <br />3.07 CONSTRUCTION JOINTS <br />All longitudinal joints maybe construction joints at the contractor's option. Transverse construction <br />joints shall be installed whenever the placing of concrete is suspended a sufficient length of time that <br />the concrete may harden. <br />3.08 FINAL ACCEPTANCE <br />A. Before the pavement will be considered for acceptance, all items shall be completed in substantial <br />accordance with the Plans and Specifications. All equipment, surplus materials, and construction <br />debris shall be removed from the project. <br />B. The pavement shall be closed to traffic after the concrete is placed, until 28 day test cylinders <br />indicate the section has reached the specified compressive strength under ordinary field <br />conditions. <br />END OF SECTION <br />02752 — Concrete Paving <br />02752- 7 <br />