Laserfiche WebLink
following: <br />1. Air temperature of 45 degrees F. to 80 degrees F. = 90 minutes maximum. <br />2. Air temperature over 80 degrees F. with a retarder added to the mix = 90 minutes <br />maximum. <br />3. Air temperature over 80 degrees F. without a retarder added to the mix = 60 minutes <br />maximum. <br />E. PLACING CONCRETE <br />The concrete shall be deposited on the grade in such a manner as to require as little re -handling <br />as possible. It shall be deposited in successive batches in a continuous operation. The <br />concrete shall be consolidated by suitable means so as to preclude the formation of voids <br />or honeycomb pockets. <br />F. PLACING IN COLD WEATHER <br />The Contractor shall be responsible for protecting concrete placed in cold weather and any <br />concrete damaged by frost action shall be removed and replaced at his expense. <br />3.04 FINISHING <br />A. The concrete shall be struck off, consolidated and finished with mechanical equipment in <br />such a manner that after final finishing, it shall conform to the pavement cross section shown <br />on the Plans. Hand finishing will be permitted in narrow widths, areas of irregular dimensions, <br />and in the event of breakdown of the mechanical equipment, to finish the concrete already <br />deposited on the grade. <br />B. FINAL SURFACE FINISH <br />The finished surface of the concrete pavement shall have a uniform skid resistant texture formed <br />by a burlap drag or a stiff broom as required by the Engineer's Representative, <br />C. PAVEMENT EXPOSED TO RAIN DURING CONSTRUCTION <br />1. The Contractor shall have, always available, materials to protect the surface of the <br />plastic concrete against rain. Areas of the pavement surface where the texture has <br />been damaged by the protective cover shall be re -textured and cured unless the <br />concrete has hardened. Areas of pavement surface that exhibit a smooth sandy appearance <br />after the rain ceases shall be textured and cured. An attempt shall be made to impart the <br />specified texture to these areas before applying the membrane curing material. No other <br />remedial work shall be required. Areas that have suffered some surface erosion and <br />have coarse aggregate exposed shall be reworked by hand methods or with the <br />finishing machine when the form paving method is used. Fresh concrete containing <br />the same materials and properties as the pavement concrete shall be added to maintain <br />an adequate supply in front of the screeds or machine to assure replacement of the <br />concrete eroded from the surface. The surface shall then be textured and cured as specified. <br />2. If pavement edges have been severely eroded and the concrete has not set, the edges shall <br />02752 — Concrete Paving <br />02752- 6 <br />J <br />