My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 09220 - PORTLAND CEMENT PLASTER <br /> PART 1 - GENERAL <br /> 1 . 1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br /> Division 1 Specification Sections, apply to this Section. <br /> 1 .2 SUMMARY <br /> A. This Section includes the following : <br /> 1 . Exterior portland cement plasterwork (stucco) . <br /> 2 . Exterior portland cement plasterwork (skim coat stucco). <br /> B . Related Sections include the following: <br /> 1 . Division 7 Section "Joint Sealants " for sealants installed with exterior portland cement plaster <br /> ( stucco) . <br /> 1 . 3 SUBMITTALS <br /> A. Product Data: For each type of product indicated. <br /> B . Samples for Verification: For each type of textured finish coat indicated; 12 by 12 inches (305 by 305 <br /> mm) , and prepared on rigid backing. <br /> 1A QUALITY ASSURANCE <br /> A. Mockups : Before plastering, install mockups of at least 100 sq. ft. (9 sq. m) in surface <br /> area to <br /> demonstrate aesthetic effects and set quality standards for materials and execution. <br /> 1 . Install mockups for each type of finish indicated. <br /> 2 . Approved mockups may become part of the completed Work if undisturbed at time of Substantial <br /> Completion. <br /> 1 . 5 DELIVERY, STORAGE, AND HANDLING <br /> A. Store materials inside under cover and keep them dry and protected against damage from weather, direct <br /> sunlight, surface contamination, corrosion, construction traffic, and other causes . <br /> 1 . 6 PROJECT CONDITIONS <br /> A. Comply with ASTM C 926 requirements . <br /> Wabasso Beach Park <br /> Indian River County <br /> DAA Project No . 6008 <br /> 09220 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.