My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-109
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 10:33:55 AM
Creation date
10/1/2015 3:29:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
04/14/2009
Control Number
2009-109
Agenda Item Number
15.B.2
Entity Name
Waste Management Inc. of Florida
Subject
Class 1 Landfill Operations expansion and partial closure
Second Amendment
Area
1325 74th Ave. SW
Supplemental fields
SmeadsoftID
10582
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE #2 <br /> PRIMARY BID WORKSHEET = REVISED 19 MARCH 2009 <br /> INDIAN RIVER COUNTY LANDFILL <br /> BORROW POND CONSTRUCTION <br /> SCHEDULE #2 TO SECOND AMENDMENT EARIDGE TRUCKING <br /> Item <br /> No. Item anti Total Cost <br /> SCOPEASE O W <br /> S&* Preparation <br /> 1 Mobilization/Demobilization 1 $ 7 000.00 <br /> 2 Surve i 10 $ 1200000 <br /> 3 Removal Relocation and R lantin of Trees see Note 4 585 $ 10t77150 <br /> 4 Clearing, Gru Oing and Stripping 10.5 AC 1 $ 1 820.00 $ 19 110.00 <br /> 5 Dowattrin System see Note 6 1 LS $ 201000a00 $ 20 000.00 <br /> 6 Silt Fence includes construction entrance) 2,988 LF $ 0.79 $ 2 360.52 <br /> 7 Stockpile Area Management and Erosion Control see Note 5 1 1 AC $ 3 500.00 $ 3 500.00 <br /> Stornwater Control <br /> 8 Temporary Recharge Ditch 1950 LF $ 29 .75 $ 58 012. 50 <br /> 9 Construction Stormwater Control see Note 6 4 MO $ 13 014.00 $ 52 056.00 <br /> 10 Check Dam 1 LS $ 2 75O.00 $ 2t750#00 <br /> 11 Revegetation and Stabilization Stockpile Area 10.5 AC $ 3 100.00 $ 32550s00 <br /> F <br /> Construction <br /> ee Note 6 4 MO $ 1 575 .00 $ 6 00.00 <br /> P SUM FIXED FEE S 226412.52 <br /> AGEMENT CONTRACT MANAGEMENT 10% $ 22 641.25 <br /> S 249053.77 <br /> CY 20% (IF NEEDED) $ 49,810.75 <br /> TOTAL POTENTIAL CONTRACT PRICE WITH 20% <br /> CONTINGENCY AND 10% WM CONTRACT <br /> MANAGEMENT FEE 298 864.53 <br /> * The Waste Management fee of 10% is included within the contingency amount. <br /> SHEET 1 OF 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.