My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-109
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 10:33:55 AM
Creation date
10/1/2015 3:29:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
04/14/2009
Control Number
2009-109
Agenda Item Number
15.B.2
Entity Name
Waste Management Inc. of Florida
Subject
Class 1 Landfill Operations expansion and partial closure
Second Amendment
Area
1325 74th Ave. SW
Supplemental fields
SmeadsoftID
10582
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE #1 ( REVISED 4 MARCH 2009) <br /> SOLID WASTE DISPOSAL DISTRICT <br /> INDIAN RIVER COUNTY LANDFILL ` <br /> VERTICAL EXPANSION AND PARTIAL CLOSURE <br /> Item Work Descriptionatem <br /> Na Work Speciaitla Inc. <br /> 30Miscellaneous Storm Water Strwtures (Note VIII) Lamp Sum I $2, 100.00 56,300.00 $8,400.00 <br /> $8,400.00 <br /> 31 Erosion and SedimentControls Lump Sum <br /> I 52, 137.00 54,273.00 $6,410.00 $6,410.00 <br /> 32 <br /> Permanent Revegettuion Lutnp Sum 1 $209250.00 $ 11 ,880.00 $32, 130.00 $32,130.00 <br /> TOTAL (LUMP SUM FIXED FEE) 5461940.00S3 99,700.51 <br /> WASTE MANAGEMENT CONTRACT MANAGEMENT 5% S 1640985.03 <br /> CONTINGENCY 20% aF NEEDED) V6$5.54 <br /> 56929937.1 <br /> TOTAL POTENTIAL CONTRACT PRICE WITH 20% <br /> CONTINGENCY AND 5% WM CONTRACT <br /> MANAGEMENT FEE <br /> $4, 157 6221,64 <br /> Notes L MobiftedmWDemobIffizatim shin include any Pffb&l dMadUabon required for all compondft of oonshtwtion specified and <br /> in the C nsumcdon Drawings and TeeWW Spxrf cram s <br /> II* 110 survey activities (It= 2) shill incl initial and final survey tluoughout the do fion of the <br />project. <br /> III. The Site PrePwatim activities (Item 3) shall include cls, pAbiM suVpin& and surface grading. <br /> V1. Thelmv Mk" tiro and tie-in to VdIting geomembnne (IN= 15 and 22) include exposing eddsmsggeosytb dhx, extrusion <br />w e d and <br /> MiStiN and Pied Y�9 a. any services requked to provide the proper Seal <br /> bdwea <br /> V. I 1auQd aneoin storm water atrtamurs (Item 30) include, but are not limikd to, addkb�onai downdrain <br /> pipe rdaW imam, nprap, can m P)mee opncieSe +inp at the drainage Wow <br /> geomembrane tub sheet, CPP redwem and pipe conoaaoss. <br /> VI. r4n wolk dmu bi dWW in bloc wA be paid basad on measured quer ies of in acoordwe the erechriod <br /> Spbacatw m. Lump Som amount wM be increased or <br /> via change order to reflect the messwed work completed. <br /> " The Waste Management fee of 5% Is included within the contingency amount. <br /> F1.153A11.80339.4s <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.