Laserfiche WebLink
535 Courtney Hodges Blvd. <br /> P.O. Box 1350 <br /> Perry, Georgia 31069 <br /> tel* 478-987-0303 800-223-3695 <br /> lax : 478-987-2991 <br /> www.utiltiyservice.com <br /> Utility Service Co. <br /> e < o 9 r o a A r r u <br /> I <br /> WATER TANK MAINTENANCE CONTRACT <br /> This agreement entered into by and between Indian River County Utilities-Vero Beach, Florida <br /> hereinafter known as the Owner, and Utility Service Co. , Inc . hereinafter known as the Company. <br /> The Owner agrees to employ the Company to provide the professional service needed to maintain its <br /> 750,000 gallon water storage tank located at U S Hiehwav #1 - Roseland Tank. <br /> This agreement outlines the Company' s responsibility for the care and maintenance of the above <br /> described water storage tank. Care and maintenance shall include the following: <br /> The Company will annually inspect and service the tank beginning in the year 2007 . The tank and tower <br /> will be thoroughly inspected to ensure that the structure is in a sound, watertight condition . <br /> Biennially, beginning with the first washout/inspection in 2007, the tank will be completely drained and <br /> cleaned to remove all mud, silt, and other accumulations that might be harmful to the tank or its contents . <br /> This cleaning will utilize high pressure equipment with chemical injection. After cleaning is completed, <br /> the interior will be thoroughly inspected and disinfected prior to returning to service . <br /> The Company shall furnish specialized services including engineering and inspection services needed to <br /> maintain and repair the tank and tower during the term of this contract. These repairs include steel <br /> replacement, steel parts, expansion joints, water level indicators, sway rod adjustments, manhole <br /> covers/gaskets, and other component parts of the tank or tower. <br /> The Company will clean and repaint the interior and/or exterior of the tank at such time as complete <br /> repainting is needed. The need for interior painting is to be determined by the thickness of the existing <br /> liner and its protective condition. The need for exterior painting is to be determined by the appearance <br /> and protective condition of the existing paint. <br /> When painting is needed, all products and procedures will be equal to, or exceed the requirements of the <br /> Florida Department of Environmental Protection, the American Water Works Association, and the <br /> Steel Structures Painting Council as to surface preparation, coating materials, and disinfection . <br /> When interior renovation is needed, procedures as outlined in A. W .W .A.-D102 specifications for <br /> cleaning and coating of potable water tanks will be followed. Only material approved for use in potable <br /> water tanks will be used on any interior surface area. <br /> At the time the exterior requires painting, the Company agrees to utilize a coating system which best suits <br /> the site conditions, environment, and general location of the tank. <br /> The Company will install an anti-climb device on the access ladder to prevent unauthorized persons from <br /> climbing the tower. <br /> Page 1 of 3 <br /> Copyright 2002, <br /> Utility Service Co. , Inc. <br />