CONTRACTOR, any Subcontractor, Supplier, or any other pertinent data such as catalog numbers, and the use <br />for which <br /> individual or entity directly or indirectly employed by any of them intended and otherwise as ENGINEER may require to enable <br /> ' to perform any of the Work, or anyone for whose acts any of ENGINEER to review the submittal for the <br /> limited purposes <br /> them may be liable, shall be remedied by CONTRACTOR required by paragraph 6. 17. E. The numbers of each Sample <br /> to <br /> (except damage or loss attributable to the fault of Drawings or be submitted will be as specified in the Specifications. <br /> Specifications or to the acts or omissions of OWNER or <br /> ENGINEER or ENGINEER's Consultant, or anyone employed C. Where a Shop Drawing or Sample is required by the <br /> by any of them , or anyone for whose acts any of them may be Contract Documents or the schedule of Shop Drawings <br /> and <br /> liable, and not attributable , directly or indirectly, in whole or in Sample submittals acceptable to ENGINEER <br />as required by <br /> part, to the fault or negligence of CONTRACTOR or any paragraph 2. 07, any related Work performed prior to <br /> Subcontractor, Supplier, or other individual or entity directly or ENGINEER's review and approval of the pertinent submittal will <br /> indirectly employed by any of them ) . CONTRACTOR's duties be at the sole expense and responsibility of CONTRACTOR. <br /> and responsibilities for safety and for protection of the Work <br /> shall continue until such time as all the Work is completed and D. Submittal Procedures <br /> ENGINEER has issued a notice to OWNER and <br /> CONTRACTOR in accordance with paragraph 14.07. 6 that the 1 . 13efore submitting each Shop Drawing or Sam- <br /> Work is acceptable (except as otherwise expressly provided in ple , CONTRACTOR shall have determined and verified: <br /> connection with Substantial Completion ). <br /> a . all field measurements, quantities, dimen- <br /> 6 . 14 Safety Representative sions , specified performance criteria, installation <br /> requirements, materials, catalog numbers, and <br /> A. CONTRACTOR shall designate a qualified and similar information with respect thereto; <br /> ' experienced safety representative at the Site whose duties and <br /> responsibilities shall be the prevention of accidents and the b. all materials with respect to intended <br /> use, <br /> maintaining and supervising of safety precautions and fabrication , shipping , handling , storage, assembly, <br /> programs . and installation pertaining to the performance of the <br /> ' 6 . 15 Hazard Communication Programs Work; <br /> c. all information relative to means , methods, <br /> A. CONTRACTOR shall be responsible for coordinating techniques, sequences , and procedures of <br /> ' any exchange of material safety data sheets or other hazard construction and safety precautions and programs <br /> communication information required to be made available to or incident thereto; and <br /> exchanged between or among employers at the Site in <br /> accordance with Laws or Regulations . d . CONTRACTOR shall also have reviewed <br /> ' and coordinated each Shop Drawing or Sample with <br /> 6 . 16 Emergencies other Shop Drawings and Samples and with the <br /> requirements of the Work and the Contract Docu- <br /> A. In emergencies affecting the safety or protection of ments . <br /> persons or the Work or property at the Site or adjacent thereto, <br /> CONTRACTOR is obligated to act to prevent threatened dam- 2. Each submittal shall bear a stamp or specific <br /> age, injury, or loss. CONTRACTOR shall give ENGINEER written indication that CONTRACTOR has satisfied <br /> prompt written notice if CONTRACTOR believes that any CONTRACTOR's obligations under the Contract <br /> ' significant changes in the Work or variations from the Contract Documents with respect to CONTRACTOR's review <br /> Documents have been caused thereby or are required as a and approval of that submittal . <br /> result thereof. If ENGINEER determines that a change in the <br /> Contract Documents is required because of the action taken by 3.At the time of each submittal, CONTRACTOR <br /> ' CONTRACTOR in response to such an emergency, a Work shall give ENGINEER specific written notice of such <br /> Change Directive or Change Order will be issued . variations, if any, that the Shop Drawing or Sample <br /> submitted may have from the requirements of the <br /> 6 . 17 Shop Drawings and Samples Contract Documents, such notice to be in a written com- <br /> munication separate from the submittal ; and , in addition , <br /> A. CONTRACTOR shall submit Shop Drawings to shall cause a specific notation to be made on each <br /> ENGINEER for review and approval in accordance with the Shop Drawing and Sample submitted to ENGINEER for <br /> acceptable schedule of Shop Drawings and Sample submittals. review and approval of each such variation. <br /> All submittals will be identified as ENGINEER may require and <br /> ' in the number of copies specified in the General Requirements. E . ENGINEER's Review <br /> The data shown on the Shop Drawings will be complete with <br /> respect to quantities, dimensions , specified performance and 1 . ENGINEER will timely review and approve Shop <br /> design criteria , materials, and similar data to show ENGINEER Drawings and Samples in accordance with the schedule <br /> ' the services , materials, and equipment CONTRACTOR of Shop Drawings and Sample submittals acceptable to <br /> proposes to provide and to enable ENGINEER to review the ENGINEER. ENGINEER's review and approval will be <br /> information for the limited purposes required by paragraph only to determine if the items covered by the submittals <br /> 6 . 17. E. will, after installation or incorporation in the Work, con- <br /> form to the information given in the Contract Documents <br /> B. CONTRACTOR shall also submit Samples to and be compatible with the design concept of the <br /> ENGINEER for review and approval in accordance with the completed Project as a functioning whole as indicated <br /> acceptable schedule of Shop Drawings and Sample submittals. by the Contract Documents. <br /> ' Each Sample will be identified clearly as to material , Supplier, <br /> 6706-38392\ 12/5/03 00700- 19 VRB <br />