B. If CONTRACTOR performs any Work knowing or B. Removal of Debris During Performance of the Work-
<br /> having reason to know that it is contrary to Laws or Regulations , During the progress of the Work CONTRACTOR shall keep the
<br /> CONTRACTOR shall bear all claims, costs , losses, and Site and other areas free from accumulations
<br /> of waste
<br /> damages (including but not limited to all fees and charges of materials, rubbish, and other debris . Removal and
<br />disposal of
<br /> engineers, architects, attorneys, and other professionals and all such waste materials , rubbish, and other debris shall conform to
<br /> court or arbitration or other dispute resolution costs) arising out applicable Laws and Regulations.
<br /> of or relating to such Work; however, it shall not be
<br /> CONTRACTOR's primary responsibility to make certain that the C. Cleaning. Prior to Substantial Completion of the Work
<br /> Specifications and Drawings are in accordance with Laws and CONTRACTOR shall dean the Site and make it ready
<br /> for
<br /> Regulations, but this shall not relieve CONTRACTOR of utilization by OWNER. At the completion of the Work
<br /> CON-
<br /> CONTRACTOR's obligations under paragraph 3.03. TRACTOR shall remove from the Site all tools, appliances,
<br /> construction equipment and machinery, and surplus materials
<br /> C. Changes in Laws or Regulations not known at the and shall restore to original condition all property not designated
<br /> time of opening of Bids (or, on the Effective Date of the for alteration by the Contract Documents.
<br /> Agreement if there were no Bids) having an effect on the cost or
<br /> time of performance of the Work may be the subject of an D. Loading Structures: CONTRACTOR shall not load
<br /> adjustment in Contract Price or Contract Times. If OWNER and nor permit any part of any structure to be loaded in any manner
<br /> CONTRACTOR are unable to agree on entitlement to or on the that will endanger the structure, nor shall CONTRACTOR
<br /> amount or extent, if any, of any such adjustment, a Claim may subject any part of the Work or adjacent property to stresses or
<br /> be made therefore as provided in paragraph 10.05. pressures that will endanger it.
<br /> 6. 10 Taxes 6. 12 Record Documents
<br /> A. CONTRACTOR shall pay all sales, consumer, use, A. CONTRACTOR shall maintain in a safe place at the
<br /> and other similar taxes required to be paid by CONTRACTOR in Site one record copy of all Drawings, Specifications , Addenda,
<br /> accordance with the Laws and Regulations of the place of the Written Amendments, Change Orders, Work Change
<br /> Project which are applicable during the performance of the Directives, Field Orders , and written interpretations and
<br /> Work• clarifications in good order and annotated to show changes
<br /> made during construction. These record documents together
<br /> 6. 11 Use of Site and Other Areas with all approved Samples and a counterpart of all approved
<br /> Shop Drawings will be available to ENGINEER for reference.
<br /> A. Limitation on Use of Site and Other Areas Upon completion of the Work, these record documents,
<br /> Samples, and Shop Drawings will be delivered to ENGINEER
<br /> 1 . CONTRACTOR shall confine construction equip- for OWNER.
<br /> ment, the storage of materials and equipment, and the
<br /> operations of workers to the Site and other areas 6. 13 Safety and Protection
<br /> permitted by Laws and Regulations, and shall not
<br /> unreasonably encumber the Site and other areas with A. CONTRACTOR shall be solely responsible for
<br /> construction equipment or other materials or equipment. initiating, maintaining and supervising all safety precautions and
<br /> CONTRACTOR shall assume full responsibility for any programs in connection with the Work. CONTRACTOR shall
<br /> damage to any such land or area, or to the owner or take all necessary precautions for the safety of,
<br /> and shall
<br /> occupant thereof, or of any adjacent land or areas provide the necessary protection to prevent damage,
<br /> injury or
<br /> resulting from the performance of the Work. loss to:
<br /> 2. Should any claim be made by any such owner or 1 . all persons on the Site or who may be affected
<br /> occupant because of the performance of the Work, by the Work;
<br /> CONTRACTOR shall promptly settle with such other
<br /> party by negotiation or otherwise resolve the claim by 2. all the Work and materials and equipment to be
<br /> arbitration or other dispute resolution proceeding or at incorporated therein, whether in storage on or off the
<br /> law- Site; and
<br /> 3. To the fullest extent permitted by Laws and 3. other property at the Site or adjacent thereto,
<br /> Regulations, CONTRACTOR shall indemnify and hold including trees, shrubs, lawns , walks, pavements,
<br /> harmless OWNER, ENGINEER, ENGINEER's roadways, structures, utilities , and Underground Facili-
<br /> Consultant, and the officers, directors, partners , ties not designated for removal, relocation, or
<br /> employees, agents, and other consultants of each and replacement in the course of construction.
<br /> any of them from and against all claims, costs, losses,
<br /> and damages (including but not limited to all fees and B. CONTRACTOR shall comply with all applicable Laws
<br /> charges of engineers, architects, attorneys, and other and Regulations relating to the safety of persons or property, or
<br /> professionals and all court or arbitration or other dispute to the protection of persons or property from damage, injury, or
<br /> resolution costs) arising out of or relating to any claim or loss; and shall erect and maintain all necessary safeguards for
<br /> action, legal or equitable, brought by any such owner or such safety and protection. CONTRACTOR shall notify owners
<br /> occupant against OWNER, ENGINEER, or any other of adjacent property and of Underground Facilities and other
<br /> party indemnified hereunder to the extent caused by or utility owners when prosecution of the Work may affect them,
<br /> based upon CONTRACTOR's performance of the and shall cooperate with them in the protection, removal,
<br /> Work• relocation, and replacement of their property. All damage,
<br /> injury, or loss to any property referred to in paragraph 6. 13.A.2
<br /> or 6. 13.A.3 caused, directly or indirectly, in whole or in part, by
<br /> 6706-38392\8/20/03 00700- 18 VRB
<br />
|