' to OWNER as indicated in paragraph 6.06. 6), whether initially insurance provided in paragraph 5.06, the agreement between
<br /> or as a replacement, against whom OWNER may have reason- the CONTRACTOR and the Subcontractor or Supplier will
<br /> able objection. CONTRACTOR shall not be required to employ contain provisions whereby the Subcontractor or
<br />Supplier
<br /> any Subcontractor, Supplier, or other individual or entity to waives all rights against OWNER, CONTRACTOR,
<br /> ENGI-
<br /> fumish or perform any of the Work against whom NEER, ENGINEER's Consultants, and all other individuals or
<br /> CONTRACTOR has reasonable objection. entities identified in the Supplementary Conditions to be listed
<br /> as insureds or additional insureds (and the officers, directors ,
<br /> ' B. If the Supplementary Conditions require the identity of partners, employees, agents, and other consultants and
<br /> certain Subcontractors, Suppliers , or other individuals or entities subcontractors of each and any of them) for all
<br />losses and
<br /> to be submitted to OWNER in advance for acceptance by damages caused by, arising out of, relating to, or resulting
<br /> from
<br /> OWNER by a specified date prior to the Effective Date of the any of the perils or causes of loss covered by such policies
<br /> and
<br /> ' Agreement, and if CONTRACTOR has submitted a list thereof any other property insurance applicable to the Work. If the
<br /> in accordance with the Supplementary Conditions , OWNER's insurers on any such policies require separate waiver forms to
<br /> acceptance (either in writing or by failing to make written objec- be signed by any Subcontractor or Supplier, CONTRACTOR
<br /> tion thereto by the date indicated for acceptance or objection in will obtain the same.
<br /> ' the Bidding Documents or the Contract Documents) of any such
<br /> Subcontractor, Supplier, or other individual or entity so identified 6. 07 Patent Fees and Royalties
<br /> may be revoked on the basis of reasonable objection after due
<br /> investigation. CONTRACTOR shall submit an acceptable A. CONTRACTOR shall pay all license fees and
<br /> replacement for the rejected Subcontractor, Supplier, or other royalties and assume all costs incident to
<br />the use in the
<br /> individual or entity, and the Contract Price will be adjusted by performance of the Work or the incorporation in the Work
<br />of any
<br /> the difference in the cost occasioned by such replacement, and invention, design, process , product, or device which
<br /> is the
<br /> an appropriate Change Order will be issued or Written subject of patent rights or copyrights
<br /> held by others. If a
<br /> Amendment signed. No acceptance by OWNER of any such particular invention, design, process, product, or device
<br /> is
<br /> Subcontractor, Supplier, or other individual or entity, whether specked in the Contract Documents for use in the performance
<br /> initially or as a replacement, shall constitute a waiver of any of the Work and if to the actual knowledge
<br /> of OWNER or
<br /> right of OWNER or ENGINEER to reject defective Work. ENGINEER its use is subject to patent rights or copyrights
<br /> calling for the payment of any license fee or royalty to others,
<br /> ' C. CONTRACTOR shall be fully responsible to OWNER the existence of such rights shall be disclosed by OWNER in
<br /> and ENGINEER for all acts and omissions of the the Contract Documents . To the fullest extent permitted by
<br /> Subcontractors, Suppliers , and other individuals or entities Laws and Regulations, CONTRACTOR shall indemnify
<br /> and
<br /> performing or furnishing any of the Work just as hold harmless OWNER, ENGINEER, ENGINEER's
<br /> ' CONTRACTOR is responsible for CONTRACTOR's own acts Consultants , and the officers, directors, partners, employees or
<br /> and omissions. Nothing in the Contract Documents shall create agents, and other consultants of each and any of them from and
<br /> for the benefit of any such Subcontractor, Supplier, or other against all claims, costs, losses, and damages
<br />(including but
<br /> individual or entity any contractual relationship between not limited to all fees and charges of engineers, architects
<br />,
<br /> OWNER or ENGINEER and any such Subcontractor, Supplier attorneys, and other professionals and all court or arbitration or
<br /> or other individual or entity, nor shall it create any obligation on other dispute resolution costs) arising out of or
<br /> relating to any
<br /> the part of OWNER or ENGINEER to pay or to see to the infringement of patent rights or copyrights incident to
<br /> the use in
<br /> payment of any moneys due any such Subcontractor, Supplier, the performance of the Work or resulting from the incorporation
<br /> ' or other individual or entity except as may otherwise be required in the Work of any invention, design, process ,
<br />product, or
<br /> by Laws and Regulations. device not specified in the Contract Documents.
<br /> D. CONTRACTOR shall be solely responsible for 6.08 Permits
<br /> ' scheduling and coordinating the Work of Subcontractors,
<br /> Suppliers , and other individuals or entities performing or fumish- A. Unless otherwise provided in the Supplementary
<br /> ing any of the Work under a direct or indirect contract with Conditions, CONTRACTOR shall obtain and pay for all
<br /> CONTRACTOR. construction permits and licenses . OWNER shall assist
<br /> ' CONTRACTOR, when necessary, in obtaining such permits
<br /> E. CONTRACTOR shall require all Subcontractors, and licenses. CONTRACTOR shall pay all governmental
<br /> Suppliers, and such other individuals or entities performing or charges and inspection fees necessary for the prosecution
<br /> of
<br /> furnishing any of the Work to communicate with ENGINEER the Work which are applicable at the time of opening of Bids, or,
<br /> through CONTRACTOR. if there are no Bids, on the Effective Date of the Agreement.
<br /> CONTRACTOR shall pay all charges of utility owners for
<br /> F. The divisions and sections of the Specifications and connections to the Work, and OWNER shall pay all charges of
<br /> the identifications of any Drawings shall not control such utility owners for capital costs related thereto, such as
<br /> ' CONTRACTOR in dividing the Work among Subcontractors or plant investment fees.
<br /> Suppliers or delineating the Work to be performed by any
<br /> specific trade. 6.09 Laws and Regulations
<br /> ' G. All Work performed for CONTRACTOR by a A. CONTRACTOR shall give all notices and comply with
<br /> Subcontractor or Supplier will be pursuant to an appropriate all Laws and Regulations applicable to the performance
<br /> of the
<br /> agreement between CONTRACTOR and the Subcontractor or Work. Except where otherwise expressly required by applicable
<br /> Supplier which specifically binds the Subcontractor or Supplier Laws and Regulations, neither OWNER nor ENGINEER shall
<br /> to the applicable terms and conditions of the Contract be responsible for monitoring CONTRACTOR's compliance with
<br /> ' Documents for the benefit of OWNER and ENGINEER. any Lrws or Regulations.
<br /> Whenever any such agreement is with a Subcontractor or
<br /> Supplier who is listed as an additional insured on the property
<br /> ' 6706-38392\8/20/03 00700- 17 VRB
<br />
|